Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43388
Well Classification: OW Status: PR - 7/1/2024
Well Name/No:Clark #14J-223
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2024
FacilityID:446777LocationID:323242
County:WELD #123Location:NWNE 14 5N65W 6
Field:WATTENBERG - #90750Elevation:4616 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:550FNL  2144 FELLat/Long: 40.405172 / -104.628782Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.405173 / -104.628783Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/3/2017
End Date: 4/19/2017
Reported: 6/5/2017
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2024             Measured TD: 15160 ft.    Vertical TD: 6766 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/20/2018
Proposed Top PZ Location:Sec:14 Twp: 5N 65W Footage: 286 FNL  1754 FWL
Bottom Hole Location:Sec:23 Twp: 5N 65W Footage: 2658 FSL  1735 FWL
Proposed Depth/Form:15181 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1400 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 0 ft., Bottom: 1400 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15181 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: 0 ft., Bottom: 15181 ft.

Wellbore Completed
Completion Date:1/12/2017
Spud Date:1/4/2017Spud Date Is:ACTUAL
Measured TD:15160 ft.Measured PB depth:15122 ft.
True Vertical TD:6766 ft.True Vertical PB depth:6766 ft.
Top PZ Location:Sec:14 Twp: 5N 65WFootage: 286 FNL  1754 FWL
Bottom Hole Location:Sec:23 Twp: 5N 65WFootage: 2658 FSL  1735 FWL
Log Types:CBL, MWD (DIL in 123-12759)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1553 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 720, Top: 0 ft., Bottom: 1553 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15137 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2155, Top: 850 ft., Bottom: 15137 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3677 ft.
SUSSEX4515 ft.
SHARON SPRINGS6764 ft.
NIOBRARA6889 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/1/2024                  Interval Top: 7418 ft.    Interval Bottom: 15070 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/29/2017Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/3/2017Treatment End Date:4/19/2017
Treatment Summary:45 Stage Plug and Perf, Perf'd from 7418-14959, 3 Toe Sleeves from 14977-15070 Total Fluid: 163,622 bbls Gel Fluid: 90,059 bbls Slickwater Fluid: 72,098 bbls 15% HCl Acid: 1,465 bbls Total Proppant: 7,707,749 lbs Silica Proppant: 7,707,749 lbs Method for determining flowback: measuring flowback tank volumes
Total fluid used in treatment (bbls):163622Max pressure during treatment (psi):5700
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:45
Total acid used in treatment (bbls):1465Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):10248
Fresh water used in treatment (bbls):162157Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7707749Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 685
BBLS_OIL 298
BTU_GAS 1285
CALC_BBLS_H2O 685
CALC_BBLS_OIL 298
CALC_GOR 4667
CALC_MCF_GAS 1391
CASING_PRESS 2856
GRAVITY_OIL 50
MCF_GAS 1391
TUBING_PRESS 1877
Perforation Data:
Interval Top:7418 ft.# Of Holes:1608
Interval Bottom:15070 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)4937
Total Gas Produced (MCF)59349
GOR12021
GOR DeterminationBOE
Average BOE per Day41.744
Average MCFE per Day242.107

 Federal Financial Assurance  i 

 Tribal Well  i No