Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-41633R&R Farms
29L-441
PDC ENERGY INC
69175
SI
3/1/2025
WATTENBERG
90750
WELD  123
SWSW 29 5N63W 6
442014
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1038 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404380191Form 179/19/202510/6/2025SHUT-IN10CONTINUOUS GAS0 NO FLOW 00No----Remediation follow up test. 10 PSI whisper blew down to 0 PSI within first few minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy.
404098504Form 172/3/20252/18/2025SHUT-IN12WHISPER GAS0 NO FLOW 340340No----Pre-P&A. 12 PSI blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test.
403822750Form 176/6/20246/12/2024 0NO FLOW NONE0 NO FLOW 337337No----Remediation follow up test. 0 PSI, no pressure or flow observed. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull6/19/20236/28/2023 1Down to Zero--0Down to Zero382382NoNoNo 
Click for SpecificsFull8/24/20229/6/2022 0Down to Zero--0Down to Zero404404NoNoneNone 
402773756Form 176/1/20218/9/2021SHUT-IN5DOWN TO 0 --0 NO FLOW 500500No----Annual Test, 5 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly.
Click for SpecificsLight4/20/20205/11/2020 20 --20 564564NoNoNo 
402420062Form 174/4/20206/12/2020 17GAS --0 NO FLOW 564564No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
402114478Form 176/25/20197/18/2019FLOWING95DOWN TO 0 --0 NO FLOW 652652No----Annual Test 95 PSI blew down to 0 PSI instantly no pressure or flow observed for the remainder of the 30 min test. PDC will attempt to collect a sample and submit to COGCC via form 43. PDC has submitted a remediation plan via sundry.