|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 3/1/2025 Measured TD: 11040 ft. Vertical TD: 6558 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 3/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 6/12/2017 | | Proposed Top PZ Location: | Sec:29 Twp: 5N 63W | Footage: 850 FSL 950 FWL | | Bottom Hole Location: | Sec:29 Twp: 5N 63W | Footage: 501 FNL 966 FWL | | Proposed Depth/Form: | 11014 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 830, Top: 0 ft., Bottom: 875 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7069 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 650, Top: 500 ft., Bottom: 7069 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5869 ft., Depth: 11014 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 8/5/2015 | | Spud Date: | 7/28/2015 | Spud Date Is: | ACTUAL | | Measured TD: | 11040 ft. | Measured PB depth: | 11033 ft. | | True Vertical TD: | 6558 ft. | True Vertical PB depth: | 6558 ft. | | Top PZ Location: | Sec:29 Twp: 5N 63W | Footage: 850 FSL 950 FWL | | Bottom Hole Location: | Sec:29 Twp: 5N 63W | Footage: 501 FNL 966 FWL | | Log Types: | CBL, MWD (DIL in 05-123-25134) | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1038 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1038 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7104 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 750, Top: 210 ft., Bottom: 7104 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6725 ft., Depth: 11036 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3362 ft. | | | | | SUSSEX | 3990 ft. | | | | | SHANNON | 4626 ft. | | | | | SHARON SPRINGS | 6323 ft. | | | | | NIOBRARA | 6445 ft. | | | | | FORT HAYS | 6940 ft. | | | | | CODELL | 7053 ft. | | | | | CARLILE | 8192 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 2/21/2025 Interval Top: 8192 ft. Interval Bottom: 10256 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 3/25/2020 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 8,192'-8,998' 9,212'-9,374' 10,073'-10,256' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 8192 ft. | # Of Holes: | 0 | | Interval Bottom: | 10256 ft. | Hole Size: | |
|
Formation FTHYS Formation Classification: OW Status: CM - 2/21/2025 Interval Top: 7541 ft. Interval Bottom: 7758 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 3/25/2020 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 7,541'-7,758' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 7541 ft. | # Of Holes: | 0 | | Interval Bottom: | 7758 ft. | Hole Size: | |
|
Formation CLCDFH Formation Classification: OW Status: SI - 3/1/2025 Interval Top: 7172 ft. Interval Bottom: 11040 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 3/5/2016 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/1/2016 | Treatment End Date: | 2/2/2016 | | Treatment Summary: | 20 Stage Sliding Sleeve, Swell Packer set at 7,172'
Total Fluid: 79,183 bbls
Gel Fluid: 43,974 bbls
Slickwater Fluid: 35,236 bbls
Total Proppant: 4,379,180 lbs
Silica Proppant: 4,379,180 lbs
Method for determining flowback: measuring flowback tank volumes. | | Total fluid used in treatment (bbls): | 79183 | Max pressure during treatment (psi): | 4104 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 20 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.94 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 5168 | | Fresh water used in treatment (bbls): | 79183 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 4379180 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 149 | | BBLS_OIL | 268 | | BTU_GAS | 1290 | | CALC_BBLS_H2O | 149 | | CALC_BBLS_OIL | 268 | | CALC_GOR | 2213 | | CALC_MCF_GAS | 593 | | CASING_PRESS | 500 | | GRAVITY_OIL | 49 | | MCF_GAS | 593 | | TUBING_PRESS | 1112 |
| | Perforation Data: | | Interval Top: | 7172 ft. | # Of Holes: | 0 | | Interval Bottom: | 11040 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 2/21/2025 Interval Top: 7172 ft. Interval Bottom: 11040 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 3/25/2020 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 7,172'-7,541' 7,758'-8,192' 8,998'-9,212' 9,374'-10,073' 10,256'-11,040' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7172 ft. | # Of Holes: | 0 | | Interval Bottom: | 11040 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/09/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 03/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 06/19/2024 |
| Defined Inactive (SI ) | Y | Defined Inactive 10/01/2024 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|