WELL05-123-40250Klein
19M-232
PDC ENERGY INC
69175
PR
1/1/2025
WATTENBERG
90750
WELD  123
NWNE 19 5N64W 6
438989
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1457 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404317635Form 177/21/20258/14/2025PLUNGER LIFT59CONTINUOUS GAS0 NO FLOW 417422No----Remediation follow up test. 59 PSI gas blew down to 0 within fifteen minutes. Operator will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull7/31/20248/6/2024 0Down to Zero--0Down to Zero418418NoNoNoAnnual Test.  0 PSI, with no pressure or flow observed for the entire 30-minute test.  PDC will monitor pressure and re-test according to bradenhead policy.
403309916Form 172/1/20232/2/2023PLUNGER LIFT8DOWN TO 0 GAS0 NO FLOW 263247No----Abatement system follow up test. 8 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
403149628Form 178/22/20228/29/2022PLUNGER LIFT340CONTINUOUS GAS0 WHISPER 327323Yes----Annual Test, 340 PSI gas flow blew down to 0 PSI in 30 minutes. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly.
Click for SpecificsFull8/7/202111/1/2021 0No Flow--0No Flow501501NoNoneNone 
402424997Form 172/27/20206/17/2020 0NO FLOW --0 NO FLOW 273271No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
402087551Form 174/29/20196/25/2019FLOWING180DOWN TO 0 --0 NO FLOW 590590No----Annual Test 180 PSI blew down to 0 PSI instantly no flow or pressure after 30 min. PDC will attempt to collect a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry.
401269188Form 174/26/20174/27/2017FLOWING230GAS --0 NO FLOW 21972197No----Post Production Test. Pressure at start of test was 230 PSI, gas blew down half way through the 30 minute test, no flow through the remainder of the test
401209725Form 171/9/20172/14/2017SHUT-IN450DOWN TO 0 --0 NO FLOW 00No---- 
401209670Form 1712/30/20162/14/2017SHUT-IN600GAS --0 NO FLOW 00No----