Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40250
Well Classification: OW Status: PR - 1/1/2025
Well Name/No:Klein #19M-232
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2025
FacilityID:438990LocationID:438989
County:WELD #123Location:NWNE 19 5N64W 6
Field:WATTENBERG - #90750Elevation:4628 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:688FNL  2402 FELLat/Long: 40.389990 / -104.591980Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.389990 / -104.591970Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/15/2017
End Date: 3/3/2017
Reported: 4/12/2017
Days to report: 40
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2025             Measured TD: 16918 ft.    Vertical TD: 6632 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/3/2018
Proposed Top PZ Location:Sec:19 Twp: 5N 64W Footage: 416 FNL  2140 FEL
Bottom Hole Location:Sec:21 Twp: 5N 64W Footage: 437 FNL  2535 FWL
Proposed Depth/Form:17259 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 720, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1425 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 0 ft., Bottom: 1425 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17259 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: 0 ft., Bottom: 17259 ft.

Wellbore Completed
Completion Date:11/22/2016
Spud Date:11/8/2016Spud Date Is:ACTUAL
Measured TD:16918 ft.Measured PB depth:16896 ft.
True Vertical TD:6632 ft.True Vertical PB depth:6632 ft.
Top PZ Location:Sec:19 Twp: 5N 64WFootage: 416 FNL  2140 FEL
Bottom Hole Location:Sec:21 Twp: 5N 64WFootage: 437 FNL  2535 FWL
Log Types:CBL, MWD (DIL in 123-20129)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1457 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 0 ft., Bottom: 1457 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16910 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2215, Top: 540 ft., Bottom: 16910 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3652 ft.
SUSSEX4213 ft.
SHANNON4969 ft.
SHARON SPRINGS6484 ft.
NIOBRARA6659 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/1/2025                  Interval Top: 6963 ft.    Interval Bottom: 16800 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/13/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/15/2017Treatment End Date:3/3/2017
Treatment Summary:71 Stage Plug and Perf, Perf'd from 6963-16685, 1 Toe Sleeve from 16796-16800 Total Fluid: 233,938 bbls Gel Fluid: 144,732 bbls Slickwater Fluid: 87,160 bbls 15% HCl Acid: 2,046 bbls Total Proppant: 12,412,910 lbs Silica Proppant: 12,412,910 lbs Method for determining flowback: measuring flowback tank volumes
Total fluid used in treatment (bbls):233938Max pressure during treatment (psi):4458
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:71
Total acid used in treatment (bbls):2046Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):12823
Fresh water used in treatment (bbls):231892Disposition method For flowback:DISPOSAL
Total proppant used (lbs):12412910Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6751 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/21/2017Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 775
BBLS_OIL 337
BTU_GAS 1351
CALC_BBLS_H2O 775
CALC_BBLS_OIL 337
CALC_GOR 3471
CALC_MCF_GAS 1170
CASING_PRESS 2740
GRAVITY_OIL 50
MCF_GAS 1170
TUBING_PRESS 2034
Perforation Data:
Interval Top:6963 ft.# Of Holes:2520
Interval Bottom:16800 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)5748
Total Gas Produced (MCF)51730
GOR8999
GOR DeterminationBOE
Average BOE per Day40.169
Average MCFE per Day232.997

 Federal Financial Assurance  i 

 Tribal Well  i No