Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-39387Kodak North FD
25-120HC
PDC ENERGY INC
69175
PR
2/1/2020
WATTENBERG
90750
WELD  123
SENW 26 6N67W 6
333035
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1529 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
Click for SpecificsFull2/11/20262/16/2026 0No Flow--0No Flow542544NoNoNoAnnual Test.  0 PSI, with no pressure or flow observed for the entire 30-minute test.  Operator will monitor pressure and re-test according to bradenhead policy.
404384733Form 1710/2/202510/8/2025PLUNGER LIFT7DOWN TO 0 GAS0 NO FLOW 465500No----Remediation follow up test. 7 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy.
404147552Form 173/19/20253/31/2025PLUNGER LIFT4DOWN TO 0 GAS0 NO FLOW 590588No----Remediation follow up test. 4 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull1/20/20251/28/2025 10Down to Zero--0No Flow483509NoNoNoAnnual Test.  10 PSI blew down to 0 PSI within first few seconds of test.  No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull2/13/20242/26/2024Plunger Lift1Down to Zero--0Down to Zero340341NoNoNoAnnual Test.  1 PSI blew down to 0 PSI within first few seconds of test.  No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull6/1/20236/12/2023 16Down to Zero--0Down to Zero637637NoNoNoAnnual Test. 16 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403079599Form 176/7/20226/15/2022PLUNGER LIFT75DOWN TO 0 WATER H200 CONTINUOUS 639641No----Test after pressure discovery. Water on open, made 1 cup and died to drip. Not enough volume to sample. Produced about 1.5 cups of water total.
Click for SpecificsLight8/27/20219/6/2021Flowing0 --0 986992NoNoNoNTO Gas at open for 10 seconds. Then dead.
402357804Form 173/25/20203/31/2020FLOWING0WHISPER --0 NO FLOW -10-10No----Test after DOFP. Whisper on open, died in 10 seconds.
402283369Form 171/8/20201/13/2020SHUT-IN0NO FLOW --0 NO FLOW 00No----Test prior to toe-prep/frac.