Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39387
Well Classification: OW Status: PR - 2/1/2020
Well Name/No:Kodak North FD #25-120HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2020
FacilityID:437034LocationID:333035
County:WELD #123Location:SENW 26 6N67W 6
Field:WATTENBERG - #90750Elevation:4760 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2252FNL  1910 FWLLat/Long: 40.459011 / -104.863500Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.459011 / -104.863500Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/19/2020
End Date: 1/28/2020
Reported: 2/6/2020
Days to report: 9
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2020             Measured TD: 16113 ft.    Vertical TD: 7115 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/17/2018
Proposed Top PZ Location:Sec:26 Twp: 6N 67W Footage: 1507 FNL  2056 FWL
Bottom Hole Location:Sec:25 Twp: 6N 67W Footage: 1456 FNL  107 FEL
Proposed Depth/Form:15715 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2301 , Unit Acreage: 1120, Drill Unit: S25:All,S26:E2,E2W2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1514 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 0 ft., Bottom: 1514 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15902 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2049, Top: 3500 ft., Bottom: 15902 ft.

Wellbore Completed
Completion Date:12/4/2019
Spud Date:1/21/2017Spud Date Is:ACTUAL
Measured TD:16113 ft.Measured PB depth:16102 ft.
True Vertical TD:7115 ft.True Vertical PB depth:7115 ft.
Top PZ Location:Sec:26 Twp: 6N 67WFootage: 1507 FNL  2056 FWL
Bottom Hole Location:Sec:25 Twp: 6N 67WFootage: 1456 FNL  107 FEL
Log Types:
Log Types:Mud Log, MWD/LWD, CBL, Composite
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1529 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 765, Top: 0 ft., Bottom: 1529 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16113 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2050, Top: 3175 ft., Bottom: 16113 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: 0 ft., Depth: , Bottom: 384 ft., Sacks: 115, Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3512 ft.3606 ft.NN
SUSSEX3999 ft.4191 ft.NN
SHANNON4575 ft.4634 ft.NN
SHARON SPRINGS6847 ft.NN
NIOBRARA6980 ft.NN
FORT HAYS7444 ft.NN
CODELL7522 ft.NN
CARLILE15936 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 7/29/2020                 Interval Top: 15936 ft.    Interval Bottom: 15889 ft.

 Completed Information for Formation CARLILE
1st Production Date:2/12/2020Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Carlile Perf Interval: 15936' - 15889'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:15936 ft.# Of Holes:1230
Interval Bottom:15889 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/29/2020                 Interval Top: 13648 ft.    Interval Bottom: 13686 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:2/12/2020Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:FT. Hays Perf Interval: 13648' - 13686'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:13648 ft.# Of Holes:1230
Interval Bottom:13686 ft.Hole Size:0.38 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 2/5/2020                  Interval Top: 7737 ft.    Interval Bottom: 15889 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:2/12/2020Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/19/2020Treatment End Date:1/28/2020
Treatment Summary:12 bbls 15% HCL Acid; 598,082 # 100 Mesh Sand; 87,411,083 # 20/40 Sand; 134,798 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):134810Max pressure during treatment (psi):4403
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:41
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):13134
Fresh water used in treatment (bbls):134798Disposition method For flowback:DISPOSAL
Total proppant used (lbs):88009165Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6970 ft.
Tubing Packer Depth:6960 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/5/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 587
BBLS_OIL 358
BTU_GAS 1306
CALC_BBLS_H2O 587
CALC_BBLS_OIL 358
CALC_GOR 1145
CALC_MCF_GAS 410
GRAVITY_OIL 45
MCF_GAS 410
TUBING_PRESS 930
Perforation Data:
Interval Top:7737 ft.# Of Holes:1230
Interval Bottom:15889 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/29/2020                 Interval Top: 7522 ft.    Interval Bottom: 15935 ft.

 Completed Information for Formation CODELL
1st Production Date:2/12/2020Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Codell Perf Interval: 13687' - 15935'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7522 ft.# Of Holes:1230
Interval Bottom:15935 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)6018
Total Gas Produced (MCF)67788
GOR11264
GOR DeterminationBOE
Average BOE per Day49.017
Average MCFE per Day284.326

 Federal Financial Assurance  i 

 Tribal Well  i No