| 404182082 | Form 17 | 4/14/2025 | 4/28/2025 | PLUNGER LIFT | 3 | DOWN TO 0 | GAS | 0 | NO FLOW | 217 | 218 | No | -- | -- | Remediation follow up test. 3 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403773380 | Form 17 | 4/22/2024 | 4/30/2024 | PLUNGER LIFT | 54 | DOWN TO 0 | GAS | TSTM | WHISPER | 208 | 222 | No | -- | -- | Annual test. 54 PSI blew down to almost 0 in seconds, whisper gas for entire test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403480892 | Form 17 | 7/28/2023 | 7/31/2023 | PLUNGER LIFT | 67 | CONTINUOUS | GAS | 0 | NO FLOW | 296 | 302 | Yes | -- | -- | High Pressure Verification test. 67 PSI gas flow blew down to 0 PSI in 5 minutes. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 4/5/2023 | 4/10/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 383 | 382 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 6/15/2022 | 7/6/2022 | | 2 | Down to Zero | -- | 0 | Down to Zero | 164 | 168 | No | None | None | |
| Click for Specifics | Full | 8/1/2021 | 11/1/2021 | | 0 | Down to Zero | -- | 0 | No Flow | 195 | 198 | No | None | None | |
| Click for Specifics | Light | 8/31/2020 | 12/3/2020 | | 10 | | -- | 0 | No Flow | 289 | 289 | No | No | No | |
| Click for Specifics | Light | 7/13/2019 | 8/18/2020 | | 0 | | -- | 0 | | 347 | 347 | No | No | No | |