Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39075
Well Classification: OW Status: PR - 12/6/2015
Well Name/No:Becker Ranch #5E-403
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/6/2015
FacilityID:436365LocationID:436361
County:WELD #123Location:NWNW 5 3N64W 6
Field:WATTENBERG - #90750Elevation:4820 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:223FNL  853 FWLLat/Long: 40.261170 / -104.581180Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.261172 / -104.581189Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/10/2015
End Date: 11/11/2015
Reported: 12/10/2015
Days to report: 29
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/6/2015             Measured TD: 11599 ft.    Vertical TD: 7034 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/6/2015
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/9/2016
Proposed Top PZ Location:Sec:5 Twp: 3N 64W Footage: 705 FNL  149 FWL
Bottom Hole Location:Sec:5 Twp: 3N 64W Footage: 514 FSL  134 FWL
Proposed Depth/Form:11548 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7646 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7646 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6330 ft., Depth: 11548 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/3/2015
Spud Date:5/25/2015Spud Date Is:ACTUAL
Measured TD:11599 ft.Measured PB depth:11592 ft.
True Vertical TD:7034 ft.True Vertical PB depth:7034 ft.
Top PZ Location:Sec:5 Twp: 3N 64WFootage: 705 FNL  149 FWL
Bottom Hole Location:Sec:5 Twp: 3N 64WFootage: 514 FSL  134 FWL
Log Types:Cased hole neutron, CBL, MWD (DIL in 123-13764)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 925 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 760, Top: 0 ft., Bottom: 925 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7438 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 0 ft., Bottom: 7438 ft., Determination Method: VISU
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7140 ft., Depth: 11595 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3841 ft.
SUSSEX4376 ft.
SHARON SPRINGS6613 ft.
NIOBRARA6799 ft.
FORT HAYS7277 ft.
CODELL7438 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/28/2016                Interval Top: 7610 ft.    Interval Bottom: 10946 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:11/28/2016Treatment End Date:N/A
Treatment Summary:Completed Depths: 7610-8604, 8711-10946
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7610 ft.# Of Holes:
Interval Bottom:10946 ft.Hole Size:

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 12/6/2015                 Interval Top: 7510 ft.    Interval Bottom: 11599 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:11/25/2015Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/10/2015Treatment End Date:11/11/2015
Treatment Summary:20 Stage Sliding Sleeve Total Fluid: 72,567 bbls Gel Fluid: 52,946 bbls Slickwater Fluid: 19,621 bbls Total Proppant: 4,399,080 lbs Silica Proppant: 4,399,080 lbs Method for determining flowback: measuring flowback tank volumes
Total fluid used in treatment (bbls):72567Max pressure during treatment (psi):6254
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):1.03
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):3420
Fresh water used in treatment (bbls):72567Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4399080Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7142 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/6/2015Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 202
BBLS_OIL 189
BTU_GAS 1288
CALC_BBLS_H2O 202
CALC_BBLS_OIL 189
CALC_GOR 6989
CALC_MCF_GAS 1321
CASING_PRESS 2256
GRAVITY_OIL 53
MCF_GAS 1321
TUBING_PRESS 1699
Perforation Data:
Interval Top:7510 ft.# Of Holes:
Interval Bottom:11599 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/28/2016                Interval Top: 7510 ft.    Interval Bottom: 11599 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:11/28/2016Treatment End Date:N/A
Treatment Summary:Completed Depths: 7510-7610, 8604-8711, 10946-11599
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7510 ft.# Of Holes:
Interval Bottom:11599 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1400
Total Gas Produced (MCF)38841
GOR27743
GOR DeterminationMCFE
Average BOE per Day22.109
Average MCFE per Day128.246

 Federal Financial Assurance  i 

 Tribal Well  i No