404097736 | Form 17 | 1/28/2025 | 2/18/2025 | SHUT-IN | 0 | WHISPER | GAS | 0 | WHISPER | 70 | 70 | No | -- | -- | Pre-P&A. 0 PSI, slight whisper gas throughout test but less than 1 PSI.
|
Click for Specifics | Full | 8/7/2024 | 8/20/2024 | | 20 | Down to Zero | -- | 0 | No Flow | 81 | 81 | No | No | No | Annual Test. 20 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
403309913 | Form 17 | 2/1/2023 | 2/2/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 77 | 77 | No | -- | -- | Abatement system follow up test. 0 PSI, no pressure or flow observed. PDC will submit sundry with bradenhead details if needed as soon as possible. PDC will continue to monitor monthly. |
403149597 | Form 17 | 8/23/2022 | 8/29/2022 | SHUT-IN | 64 | DOWN TO 0 | GAS | 0 | NO FLOW | 107 | 107 | Yes | -- | -- | Annual Test, 64 PSI gas flow blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC collected a sample 7/7/2022. PDC will continue to monitor monthly. |
402839339 | Form 17 | 10/7/2021 | 10/12/2021 | SHUT-IN | 148 | WHISPER | -- | 0 | NO FLOW | 120 | 120 | Yes | -- | -- | Post-production, 148 PSI whisper blew down to 0 PSI within first 5 minutes. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. |
402829653 | Form 17 | 9/30/2021 | 10/4/2021 | | 585 | DOWN TO 0 | GAS | 0 | NO FLOW | 119 | 119 | No | -- | -- | 6 Month Abatement System Follow Up Test, 585 PSI slight gas blew down to 0 PSI within seconds. No pressure or flow observed for the remainder of the test. PDC will continue to monitor pressure on a monthly basis and submit follow up sundry with sample results as soon as possible. |
402753991 | Form 17 | 1/19/2021 | 7/20/2021 | SHUT-IN | 0 | NO FLOW | -- | 0 | | 131 | 131 | No | -- | -- | Post Production test, 0 PSI no pressure or flow observed for the entire test. |
402424467 | Form 17 | 3/20/2020 | 6/17/2020 | | 0 | NO FLOW | -- | 0 | NO FLOW | 14 | 74 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
402114490 | Form 17 | 6/21/2019 | 7/18/2019 | FLOWING | 200 | GAS | -- | 2 | WHISPER | 318 | 318 | Yes | Yes | -- | Annual Test 200 PSI blew down to a whisper with a slight blow. 2 PSI at the end of the 30 min test. PDC has collected a sample and will submit via form 43. PDC has submitted a remediation plan via sundry. |