Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-39042Chesnut
28M-203
PDC ENERGY INC
69175
PR
10/1/2024
WATTENBERG
90750
WELD  123
NWNE 28 5N64W 6
436284
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 929 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404097736Form 171/28/20252/18/2025SHUT-IN0WHISPER GAS0 WHISPER 7070No----Pre-P&A. 0 PSI, slight whisper gas throughout test but less than 1 PSI.
Click for SpecificsFull8/7/20248/20/2024 20Down to Zero--0No Flow8181NoNoNoAnnual Test.  20 PSI blew down to 0 PSI within first few seconds of test.  No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403309913Form 172/1/20232/2/2023SHUT-IN0NO FLOW --0 NO FLOW 7777No----Abatement system follow up test. 0 PSI, no pressure or flow observed. PDC will submit sundry with bradenhead details if needed as soon as possible. PDC will continue to monitor monthly.
403149597Form 178/23/20228/29/2022SHUT-IN64DOWN TO 0 GAS0 NO FLOW 107107Yes----Annual Test, 64 PSI gas flow blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC collected a sample 7/7/2022. PDC will continue to monitor monthly.
402839339Form 1710/7/202110/12/2021SHUT-IN148WHISPER --0 NO FLOW 120120Yes----Post-production, 148 PSI whisper blew down to 0 PSI within first 5 minutes. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43.
402829653Form 179/30/202110/4/2021 585DOWN TO 0 GAS0 NO FLOW 119119No----6 Month Abatement System Follow Up Test, 585 PSI slight gas blew down to 0 PSI within seconds. No pressure or flow observed for the remainder of the test. PDC will continue to monitor pressure on a monthly basis and submit follow up sundry with sample results as soon as possible.
402753991Form 171/19/20217/20/2021SHUT-IN0NO FLOW --0  131131No----Post Production test, 0 PSI no pressure or flow observed for the entire test.
402424467Form 173/20/20206/17/2020 0NO FLOW --0 NO FLOW 1474No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
402114490Form 176/21/20197/18/2019FLOWING200GAS --2 WHISPER 318318YesYes--Annual Test 200 PSI blew down to a whisper with a slight blow. 2 PSI at the end of the 30 min test. PDC has collected a sample and will submit via form 43. PDC has submitted a remediation plan via sundry.