Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39042
Well Classification: OW Status: PR - 10/1/2024
Well Name/No:Chesnut #28M-203
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2024
FacilityID:436288LocationID:436284
County:WELD #123Location:NWNE 28 5N64W 6
Field:WATTENBERG - #90750Elevation:4620 ft.
Planned Location:380FNL  1340 FELLat/Long: 40.376510 / -104.550060Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.376517 / -104.550069Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/6/2015
End Date: 5/8/2015
Reported: 3/1/2016
Days to report: 298
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2024             Measured TD: 13855 ft.    Vertical TD: 6619 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2024
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:2/26/2016
Proposed Top PZ Location:Sec:28 Twp: 5N 64W Footage: 864 FNL  2557 FEL
Bottom Hole Location:Sec:33 Twp: 5N 64W Footage: 2135 FNL  2590 FEL
Proposed Depth/Form:13861 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7224 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7224 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6021 ft., Depth: 13836 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/3/2014
Spud Date:7/23/2014Spud Date Is:ACTUAL
Measured TD:13855 ft.Measured PB depth:13847 ft.
True Vertical TD:6619 ft.True Vertical PB depth:6619 ft.
Top PZ Location:Sec:28 Twp: 5N 64WFootage: 864 FNL  2557 FEL
Bottom Hole Location:Sec:33 Twp: 5N 64WFootage: 2135 N  2590 E
Log Types:CBL, MWD (DIL in 123-18364, 123-18468, 123-23412, 123-15253 and 123-15254)
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 929 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 0 ft., Bottom: 929 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7254 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 554, Top: 0 ft., Bottom: 7254 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7107 ft., Depth: 13851 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3528 ft.
SUSSEX4268 ft.
SHARON SPRINGS6555 ft.
NIOBRARA6737 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 11/1/2024                 Interval Top: 7435 ft.    Interval Bottom: 13764 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/8/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/6/2015Treatment End Date:5/8/2015
Treatment Summary:28 Stage Sliding Sleeve, Swell Packer Total Fluid: 124,054 bbls Gel Fluid: 97,249 bbls Slickwater Fluid: 26,805 bbls Total Proppant: 7,223,660 lbs Silica Proppant: 7,223,660 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):124054Max pressure during treatment (psi):4160
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):7364
Fresh water used in treatment (bbls):124054Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7223660Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 130
BBLS_OIL 283
BTU_GAS 1252
CALC_BBLS_H2O 130
CALC_BBLS_OIL 283
CALC_GOR 3113
CALC_MCF_GAS 881
CASING_PRESS 1395
GRAVITY_OIL 53
MCF_GAS 881
TUBING_PRESS 1209
Perforation Data:
Interval Top:7435 ft.# Of Holes:
Interval Bottom:13764 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)2
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day0.005
Average MCFE per Day0.032

 Federal Financial Assurance  i 

 Tribal Well  i No