403896345 | Form 17 | 8/19/2024 | 8/22/2024 | FLOWING | 187 | DOWN TO 0 | GAS | 0 | NO FLOW | 596 | 596 | No | -- | -- | Mitigation Bradenhead Test
WBD submitted on doc# 403151518 |
403499809 | Form 17 | 8/15/2023 | 8/17/2023 | FLOWING | 197 | DOWN TO 0 | GAS | 0 | NO FLOW | 595 | 603 | No | -- | -- | Mitigation Bradenhead Test
WBD submitted on doc# 403151518. |
403151495 | Form 17 | 8/26/2022 | 8/30/2022 | FLOWING | 243 | DOWN TO 0 | GAS | 0 | NO FLOW | 609 | 609 | Yes | Yes | -- | Mitigation Bradenhead Test
WBD attached
|
402768680 | Form 17 | 7/26/2021 | 8/5/2021 | FLOWING | 341 | DOWN TO 0 | GAS | 0 | NO FLOW | 609 | 609 | Yes | Yes | No | 341 psig initial surface casing pressure. Gas samples taken. |
402458551 | Form 17 | 7/30/2020 | 8/8/2020 | FLOWING | 371 | DOWN TO 0 | -- | 0 | NO FLOW | 632 | 617 | Yes | Yes | No | 371 BHP. Down to 0 w/in 5 min. Bradenhead Gas sample taken, production sample on file.
|
402029329 | Form 17 | 3/26/2019 | 5/1/2019 | FLOWING | 133 | WHISPER | -- | 0 | NO FLOW | 702 | 701 | Yes | Yes | No | Bradenhead test per Order No. 1V. 687 - Order 4.b. 133 psig initial surface casing. Down to 0 psig in five minutes. Gas sample taken. Crestone will submit a Form 4 sundry with a mitigation plan by 05-25-2019 per COGCC Order No. 1-232 NTO Guidance.
|
401582541 | Form 17 | 3/19/2018 | 3/22/2018 | SHUT-IN | 309 | WHISPER | -- | 0 | NO FLOW | 1188 | 1221 | Yes | Yes | No | post stim test
Braden whispered and blew down immediately, observed no flow during test |