|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 1/7/2019 Measured TD: 14580 ft. Vertical TD: 7424 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 1/7/2019 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 11/4/2017 | | Proposed Top PZ Location: | Sec:7 Twp: 1N 68W | Footage: 2100 FNL 498 FWL | | Bottom Hole Location: | Sec:6 Twp: 1N 68W | Footage: 507 FNL 427 FWL | | Proposed Depth/Form: | 14422 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1753 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 674, Top: 0 ft., Bottom: 1753 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14755 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2260, Top: , Bottom: 14755 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14422 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 262, Top: 7527 ft., Bottom: 14422 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/7/2016 | | Spud Date: | 10/30/2016 | Spud Date Is: | ACTUAL | | Measured TD: | 14580 ft. | Measured PB depth: | 14512 ft. | | True Vertical TD: | 7424 ft. | True Vertical PB depth: | 7427 ft. | | Top PZ Location: | Sec:7 Twp: 1N 68W | Footage: 2100 FNL 498 FWL | | Bottom Hole Location: | Sec:6 Twp: 1N 68W | Footage: 507 FNL 427 FWL | | Log Types: | MWD, Mud, CBL,(Triple Combo in 123-38111) | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 111, Top: 0 ft., Bottom: 98 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1788 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 835, Top: 0 ft., Bottom: 1788 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 14558 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2277, Top: 0 ft., Bottom: 14558 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4472 ft. | | N | N | | SHANNON | 5052 ft. | | N | N | | TEEPEE BUTTES | 6577 ft. | | N | N | | SHARON SPRINGS | 7485 ft. | | N | N | | NIOBRARA | 7607 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 1/7/2019 Interval Top: 7672 ft. Interval Bottom: 14235 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 5/25/2017 | Treatment End Date: | 6/3/2017 | | Treatment Summary: | Corrected treatment date(s).
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/7/2017 | Treatment End Date: | 6/2/2017 | | Treatment Summary: | 260836 bbl water, 254 bbl additives (FRP-4K, ACI-97 and ASF-67) and 131 bbl HCl in a
36 stage frac with 5866745 lb of silica quartz proppant | | Total fluid used in treatment (bbls): | 261221 | Max pressure during treatment (psi): | 8460 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 36 | | Total acid used in treatment (bbls): | 131 | Min frac gradient (psi/ft): | 0.82 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 9539 | | Fresh water used in treatment (bbls): | 260836 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 5866745 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 108 | | BBLS_OIL | 30 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 108 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 6800 | | CALC_MCF_GAS | 136 | | CASING_PRESS | 1760 | | GRAVITY_OIL | 50 | | MCF_GAS | 136 |
| | Perforation Data: | | Interval Top: | 7672 ft. | # Of Holes: | 840 | | Interval Bottom: | 14235 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 3529 |
| Total Gas Produced (MCF) | 54650 |
| GOR | 15485 |
| GOR Determination | MCFE |
| Average BOE per Day | 35.454 |
| Average MCFE per Day | 205.641 |
| Federal Financial Assurance | i | |
|
|