Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-37800Alles
22D-402
PDC ENERGY INC
69175
PR
7/1/2022
WATTENBERG
90750
WELD  123
NESE 22 5N65W 6
327103
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 929 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404292783Form 177/14/20257/24/2025PLUNGER LIFT5CONTINUOUS GAS0 NO FLOW 322328No----Remediation follow up test. 5 PSI gas blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull7/18/20247/29/2024 0Down to Zero--0Down to Zero322322NoNoNoAnnual Test.  0 PSI, with no pressure or flow observed for the entire 30-minute test.  PDC will monitor pressure and re-test according to bradenhead policy.
403310081Form 172/1/20232/2/2023PLUNGER LIFT2CONTINUOUS GAS0 NO FLOW 302304No----Abatement system follow up test. 2 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
403132789Form 178/10/20228/11/2022PLUNGER LIFT88DOWN TO 0 GAS0 NO FLOW 368368No----Engineering Ad Hoc test, 88 PSI gas flow blew down to 0 PSI within minutes with no flow or pressure for the remainder of the test. Sample collected 12/7/2021. PDC will continue to monitor monthly.
Click for SpecificsFull5/25/20226/13/2022 10Down to Zero--0Down to Zero311312NoNoneNone 
Click for SpecificsFull9/5/202111/1/2021 0No Flow--0No Flow401400NoNoneNone 
402425962Form 174/15/20206/18/2020 0NO FLOW --0 NO FLOW 466467No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
402080954Form 174/15/20196/19/2019SHUT-IN150CONTINUOUS --0 NO FLOW 837837No----Annual Test 150 PSI whisper blew down to 0 PSI after 30 min. PDC will attempt to collect a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry.
401176703Form 1712/22/20161/3/2017PLUNGER LIFT280GAS --0 NO FLOW 502521No----