Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37800
Well Classification: OW Status: PR - 7/1/2022
Well Name/No:Alles #22D-402
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2022
FacilityID:433819LocationID:327103
County:WELD #123Location:NESE 22 5N65W 6
Field:WATTENBERG - #90750Elevation:4645 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2098FSL  545 FELLat/Long: 40.383260 / -104.641860Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.383260 / -104.641860Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/23/2014
End Date: 5/24/2014
Reported: 5/19/2015
Originally Reported: 5/28/2014
Days to report: 360
Days to report: 4
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2022             Measured TD: 12701 ft.    Vertical TD: 6954 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/7/2015
Proposed Top PZ Location:Sec:23 Twp: 5N 65W Footage: 1396 FSL  434 FEL
Bottom Hole Location:Sec:23 Twp: 5N 65W Footage: 1430 FSL  501 FEL
Proposed Depth/Form:12777 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7647 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7647 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6322 ft., Depth: 12777 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/5/2014
Spud Date:4/22/2014Spud Date Is:ACTUAL
Measured TD:12701 ft.Measured PB depth:12694 ft.
True Vertical TD:6954 ft.True Vertical PB depth:6954 ft.
Top PZ Location:Sec:23 Twp: 5N 65WFootage: 1396 FSL  434 FEL
Bottom Hole Location:Sec:23 Twp: 5N 65WFootage: 1430 FSL  501 FEL
Log Types:CBL, MWD (DIL in 123-14163)
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 929 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 0 ft., Bottom: 929 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7432 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 0 ft., Bottom: 7432 ft., Determination Method: VISU
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7296 ft., Depth: 12698 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3687 ft.
SUSSEX4337 ft.
SHARON SPRINGS6607 ft.
NIOBRARA6790 ft.
FORT HAYS7334 ft.
CODELL7500 ft.
CARLILE11272 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 11/28/2016                Interval Top: 11251 ft.    Interval Bottom: 11400 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:11/28/2016Treatment End Date:N/A
Treatment Summary:Completed Depths: 11251-11400
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:11251 ft.# Of Holes:
Interval Bottom:11400 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/28/2016                Interval Top: 9181 ft.    Interval Bottom: 11000 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:11/28/2016Treatment End Date:N/A
Treatment Summary:Completed Depths: 9181-11000
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9181 ft.# Of Holes:
Interval Bottom:11000 ft.Hole Size:

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 7/1/2022                  Interval Top: 7502 ft.    Interval Bottom: 12701 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:6/20/2014Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/23/2014Treatment End Date:5/24/2014
Treatment Summary:20 Stage Sliding Sleeve Total Fluid: 74,925 bbls Gel Fluid: 60,747 bbls Slickwater Fluid: 14,178 bbls Total Proppant: 4,584,490 lbs Silica Proppant: 4,584,490 lbs Method for determining flowback volume: measuring flowback tank volumes
Total fluid used in treatment (bbls):74925Max pressure during treatment (psi):3567
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4378
Fresh water used in treatment (bbls):74925Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4584490Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7125 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/20/2014Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 159
BTU_GAS 1298
CALC_BBLS_H2O 15
CALC_BBLS_OIL 159
CALC_GOR 7358
CALC_MCF_GAS 1170
CASING_PRESS 1493
GRAVITY_OIL 56
MCF_GAS 1170
TUBING_PRESS 1181
Perforation Data:
Interval Top:7502 ft.# Of Holes:
Interval Bottom:12701 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/28/2016                Interval Top: 7502 ft.    Interval Bottom: 12701 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:11/28/2016Treatment End Date:N/A
Treatment Summary:Completed Depths: 7502-9180, 11001-11250, 11401-12701
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7502 ft.# Of Holes:
Interval Bottom:12701 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)8114
Total Gas Produced (MCF)104489
GOR12877
GOR DeterminationBOE
Average BOE per Day71.285
Average MCFE per Day413.463

 Federal Financial Assurance  i 

 Tribal Well  i No