| 404324381 | Form 17 | 7/28/2025 | 8/20/2025 | SHUT-IN | 137 | DOWN TO 0 | GAS | 4 | WHISPER | 621 | 621 | No | -- | -- | Remediation follow up test. 137 PSI whisper gas blew down to 4 in thirty minutes, whisper gas continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403879613 | Form 17 | 7/30/2024 | 8/7/2024 | SHUT-IN | 167 | CONTINUOUS | WATER AND GAS | 13 | CONTINUOUS | 0 | 0 | No | -- | -- | Annual test. 167 PSI continuous water and gas flow blew down to 13 PSI in 30 minutes. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403658380 | Form 17 | 1/17/2024 | 1/18/2024 | SHUT-IN | 140 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 594 | 594 | No | -- | -- | Abatement system follow up test. 140 PSI continuous gas and water flow blew down to 2 PSI within thirty minutes. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403480914 | Form 17 | 7/28/2023 | 7/31/2023 | SHUT-IN | 156 | CONTINUOUS | GAS AND LIQUID HYDROCARBON | 0 | NO FLOW | 592 | 592 | Yes | -- | -- | High Pressure Verification test. 156 PSI gas and fluid blew down to 0 PSI in 45 seconds. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403071151 | Form 17 | 6/7/2022 | 6/8/2022 | PLUNGER LIFT | 169 | DOWN TO 0 | GAS AND LIQUID HYDROCARBON | 0 | NO FLOW | 248 | 248 | Yes | -- | -- | Automation Alert Follow-up, 169 PSI gas and liquid hydrocarbon flow blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| 402789505 | Form 17 | 8/21/2021 | 8/24/2021 | PLUNGER LIFT | 8 | WHISPER | -- | 0 | NO FLOW | 589 | 589 | No | -- | -- | Abatement system follow up test, 8 PSI whisper blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402789515 | Form 17 | 11/20/2020 | 8/24/2021 | PLUNGER LIFT | 180 | CONTINUOUS | GAS | 0 | NO FLOW | 618 | 618 | Yes | -- | -- | Post-production, 180 PSI gas flow blew down to 0 PSI within first 5 minutes. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. |
| Click for Specifics | Light | 10/16/2020 | 12/3/2020 | | 12 | | -- | 0 | No Flow | 618 | 618 | No | No | No | |
| Click for Specifics | Light | 9/28/2019 | 8/18/2020 | | 0 | | -- | 0 | | 920 | 920 | No | No | No | |