404148837 | Form 17 | 3/24/2025 | 4/1/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
404128322 | Form 17 | 3/10/2025 | 3/14/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 450 | 450 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes.
|
Click for Specifics | Light | 1/26/2025 | 2/3/2025 | | 0 | | -- | 0 | | 1430 | 1430 | No | No | No | |
Click for Specifics | Full | 11/1/2024 | 11/12/2024 | | 0 | No Flow | -- | 0 | No Flow | 250 | 250 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 1/12/2024 | 1/18/2024 | Shut In | 0 | Down to Zero | -- | 0 | Down to Zero | 243 | 243 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 1/25/2023 | 2/13/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 708 | 708 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
Click for Specifics | Full | 3/30/2022 | 4/18/2022 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | |
Click for Specifics | Full | 9/2/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 387 | 387 | No | None | None | |
Click for Specifics | Light | 8/10/2020 | 12/3/2020 | | 0 | | -- | 0 | No Flow | 200 | 200 | No | No | No | |
Click for Specifics | Light | 3/28/2019 | 8/18/2020 | | 0 | | -- | 0 | | 787 | 787 | No | No | No | |