Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37296
Well Classification: OW Status: PA - 4/28/2025
Well Name/No:Anderson #34R-223
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/28/2025
FacilityID:432815LocationID:432817
County:WELD #123Location:NENE 34 7N66W 6
Field:WATTENBERG - #90750Elevation:4895 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:250FNL  1270 FELLat/Long: 40.538040 / -104.758820Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.538050 / -104.758820Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/11/2014
End Date: 2/12/2014
Reported: 2/21/2014
Days to report: 9
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 4/28/2025             Measured TD: 11617 ft.    Vertical TD: 7182 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 4/28/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/9/2015
Proposed Top PZ Location:Sec:34 Twp: 7N 66W Footage: 822 FNL  1151 FEL
Bottom Hole Location:Sec:34 Twp: 7N 66W Footage: 500 FSL  774 FEL
Proposed Depth/Form:11639 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7649 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7649 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6441 ft., Depth: 11639 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:1/19/2014
Spud Date:1/7/2014Spud Date Is:ACTUAL
Measured TD:11617 ft.Measured PB depth:11610 ft.
True Vertical TD:7182 ft.True Vertical PB depth:7182 ft.
Top PZ Location:Sec:34 Twp: 7N 66WFootage: 814 FNL  1098 FEL
Bottom Hole Location:Sec:34 Twp: 7N 66WFootage: 501 FSL  781 FEL
Log Types:CBL, MWD
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 931 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 0 ft., Bottom: 931 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7547 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 523 ft., Bottom: 7547 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7407 ft., Depth: 11614 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3791 ft.
SUSSEX4444 ft.
SHANNON4999 ft.
SHARON SPRINGS6795 ft.
NIOBRARA7132 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  AB - 4/28/2025                 Interval Top: 7695 ft.    Interval Bottom: 11527 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/4/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/11/2014Treatment End Date:2/12/2014
Treatment Summary:25 Stage Sliding Sleeve, Swell Packer set at 7,612' Total Fluid: 68,657 bbls Slickwater Fluid: 17,973 bbls Gel Fluid: 50,684 bbls Total Proppant: 3,666,581 lbs Silica Proppant: 3,666,581 lbs Method for determining flowback volume" measuring flowback tank volumes
Total fluid used in treatment (bbls):68657Max pressure during treatment (psi):7684
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):Min frac gradient (psi/ft):1.01
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):9916
Fresh water used in treatment (bbls):68657Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3666581Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 92
BBLS_OIL 199
BTU_GAS 1316
CALC_BBLS_H2O 92
CALC_BBLS_OIL 199
CALC_GOR 1814
CALC_MCF_GAS 361
CASING_PRESS 1669
GRAVITY_OIL 44
MCF_GAS 361
TUBING_PRESS 655
Perforation Data:
Interval Top:7695 ft.# Of Holes:0
Interval Bottom:11527 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/28/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)227
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day0.610
Average MCFE per Day3.540

 Federal Financial Assurance  i 

 Tribal Well  i No