| Click for Specifics | Full | 5/19/2025 | 7/21/2025 | | 1 | Whisper | None | 0 | No Flow | 5 | 5 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 5/8/2024 | 6/10/2024 | | 1 | Whisper | None | -- | No Flow | 41 | 42 | No | N | N | Surface Casing produced no liquid. |
| Click for Specifics | Full | 5/8/2024 | 6/10/2024 | | 1 | Whisper | None | -- | No Flow | 41 | 42 | No | N | N | Surface Casing produced no liquid. |
| Click for Specifics | Full | 5/8/2024 | 7/9/2024 | | 1 | Whisper | None | -- | No Flow | 41 | 42 | No | N | N | Surface Casing produced no liquid. |
| 403630449 | Form 17 | 12/13/2023 | 12/19/2023 | | 1 | WHISPER | GAS | 0 | NO FLOW | 39 | 39 | No | -- | -- | Surface Casing produced no liquid. |
| Click for Specifics | Full | 9/27/2022 | 10/10/2022 | Plunger Lift | 2 | Continuous | None | -- | No Flow | 2 | 2 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 9/27/2022 | 11/14/2022 | Plunger Lift | 0 | No Flow | None | -- | No Flow | 84 | 84 | No | N | N | Surface Casing produced no liquid. |
| Click for Specifics | Full | 9/30/2021 | 10/18/2021 | Plunger Lift | 1 | Whisper | None | -- | No Flow | 94 | 94 | No | N | N | Surface Casing produced no liquid. |
| Click for Specifics | Full | 10/8/2020 | 12/21/2020 | Plunger Lift | 0 | DOWN TO 0 | -- | -- | DOWN TO 0 | 91 | 91 | No | No | No | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 11/11/2019 | 12/10/2019 | | 1 | Whisper (Very Low Flow) | | 0 | Down To Zero | 127 | 129 | No | No | No | Surface casing produced no liquid. |
| 400607885 | Form 17 | 5/6/2014 | 5/13/2014 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 536 | 551 | No | -- | -- | Surface casing produced no fluid. Well was flowing. |
| 400456218 | Form 17 | 7/11/2013 | 7/25/2013 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 1367 | 1386 | No | -- | -- | Surface casing produced no fluid during form 17 test. Well was flowing. |