Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36358
Well Classification: GW Status: SI - 9/1/2025
Well Name/No:POWERS #3N-27HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date9/1/2025
FacilityID:430968LocationID:430967
County:WELD #123Location:SESW 27 2N65W 6
Field:WATTENBERG - #90750Elevation:4949 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:510FSL  1920 FWLLat/Long: 40.103698 / -104.652411Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.103699 / -104.652412Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/21/2013
End Date: 4/22/2013
Reported: 6/12/2013
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 9/1/2025             Measured TD: 11547 ft.    Vertical TD: 7071 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 9/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/29/2014
Proposed Top PZ Location:Sec:27 Twp: 2N 65W Footage: 630 FSL  1920 FWL
Bottom Hole Location:Sec:27 Twp: 2N 65W Footage: 460 FNL  1920 FWL
Proposed Depth/Form:11618 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1820 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 420, Top: 0 ft., Bottom: 1820 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7418 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 660, Top: 0 ft., Bottom: 7418 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6365 ft., Depth: 11618 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/19/2013
Spud Date:1/4/2013Spud Date Is:ACTUAL
Measured TD:11547 ft.Measured PB depth:11532 ft.
True Vertical TD:7071 ft.True Vertical PB depth:6490 ft.
Top PZ Location:Sec:27 Twp: 2N 65WFootage: 739 FSL  2039 FWL
Bottom Hole Location:Sec:27 Twp: 2N 65WFootage: 483 FNL  2113 FWL
Log Types:PRE FORM 5
Log Types:GR/GR-RES/MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1845 ft., Weight: 36.0 , Citings Type: ACTUAL
Cement:Sacks: 929, Top: 0 ft., Bottom: 1845 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7480 ft., Weight: 26.0 , Citings Type: ACTUAL
Cement:Sacks: 725, Top: 265 ft., Bottom: 7480 ft., Determination Method: CALC
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6490 ft., Depth: 11532 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7031 ft.
NIOBRARA7261 ft.

Formation NBRR                     Formation Classification:  GW                     Status:  SI - 9/1/2025                  Interval Top: 7530 ft.    Interval Bottom: 11547 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/27/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/21/2013Treatment End Date:4/22/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7530-11547. 28140 BBL CROSSLINK GEL,111 BBL LINEAR GEL,41953 BBL SLICKWATER,70204 BBL TOTAL FLUID. 207151# 20/40 SAND,2201022# 20/40 SAND,995162# 40/70 SAND,3403335# TOTAL SAND.
Total fluid used in treatment (bbls):70204Max pressure during treatment (psi):6987
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):5917
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3403335Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6984 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/4/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 225
BTU_GAS 1256
CALC_BBLS_OIL 225
CALC_GOR 578
CALC_MCF_GAS 130
CASING_PRESS 1472
GRAVITY_OIL 45
MCF_GAS 130
TUBING_PRESS 1276
Perforation Data:
Interval Top:7530 ft.# Of Holes:0
Interval Bottom:11547 ft.Hole Size:0 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)18
GOR
GOR DeterminationMCFE
Average BOE per Day0.008
Average MCFE per Day0.048

 Federal Financial Assurance  i 

 Tribal Well  i No