Click for Specifics | Light | 4/5/2025 | 5/13/2025 | | 13 | | -- | 0 | | 228 | 228 | No | No | No | |
Click for Specifics | Light | 3/19/2024 | 4/23/2024 | | 11 | | -- | 0 | | 197 | 198 | No | No | No | |
Click for Specifics | Light | 3/3/2023 | 4/10/2023 | Plunger Lift | 4 | | -- | 0 | | 185 | 199 | No | No | No | |
Click for Specifics | Light | 2/10/2022 | 3/22/2022 | Flowing | 13 | | -- | 0 | | 192 | 194 | No | No | No | |
Click for Specifics | Light | 10/21/2021 | 11/1/2021 | Flowing | 6 | | -- | 0 | | 121 | 123 | No | No | No | |
Click for Specifics | Light | 2/14/2020 | 3/16/2020 | | 10 | | -- | 0 | No Flow | 135 | 139 | No | No | No | |
Click for Specifics | Light | 10/21/2019 | 12/23/2019 | | 11 | | -- | 0 | No Flow | 158 | 159 | No | No | No | |
401187490 | Form 17 | 9/12/2016 | 1/18/2017 | SHUT-IN | 10 | CONTINUOUS | -- | 48 | DOWN TO 0 | 433 | 433 | Yes | Yes | -- | During test wittnessed fluid and stopped test. COGCC official noted the test was a failure based on fluid and having pressure. |
401057703 | Form 17 | 5/26/2016 | 6/2/2016 | PLUNGER LIFT | 214 | CONTINUOUS | -- | 0 | DOWN TO 0 | 477 | 477 | No | -- | -- | verified surface casing at 214 psi
hooked up hard line
blew down to 0 psi
started flowing fluid
stopped test due to fluid
|