|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 11/1/2023 Measured TD: 8225 ft. Vertical TD: 8069 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 11/1/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 9/28/2012 | Proposed Top PZ Location: | Sec:10 Twp: 2N 66W | Footage: 103 FNL 1500 FEL | Bottom Hole Location: | Sec:10 Twp: 2N 66W | Footage: 105 FNL 1504 FEL | Proposed Depth/Form: | 8171 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 950 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 410, Top: 0 ft., Bottom: 950 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8171 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 280, Top: 7110 ft., Bottom: 8171 ft. |
| | |
Wellbore Completed | Completion Date: | 9/27/2011 | Spud Date: | 9/21/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8225 ft. | Measured PB depth: | 8187 ft. | True Vertical TD: | 8069 ft. | True Vertical PB depth: | 8031 ft. | Top PZ Location: | Sec:10 Twp: 2N 66W | Footage: 108 FNL 1500 FEL | Bottom Hole Location: | Sec:10 Twp: 2N 66W | Footage: 105 FNL 1504 FEL | Log Types: | CBL | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1003 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 370, Top: 0 ft., Bottom: 1003 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8212 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 610, Top: 3650 ft., Bottom: 8212 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 0 ft., Depth: 3501 ft., Bottom: 3501 ft., Sacks: 767, Method: 1 INCH | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4692 ft. | | | | NIOBRARA | 7363 ft. | | | | CODELL | 7635 ft. | | | | J SAND | 8087 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 11/1/2023 Interval Top: 8121 ft. Interval Bottom: 8148 ft. Completed Information for Formation J SAND | 1st Production Date: | 11/21/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/17/2011 | Treatment Summary: | Frac'd the J-Sand 8121’-8148’, (54 holes)w/ 165,270 gal 18 # Vistar Hybrid cross linked gel containing 250,360 # 20/40 Sand. 10-17-11 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8121 ft. | # Of Holes: | 54 | Interval Bottom: | 8148 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 2/7/2012 Interval Top: 7635 ft. Interval Bottom: 7656 ft. Completed Information for Formation CODELL | 1st Production Date: | 11/21/2011 | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Date: | 10/17/2011 | Treatment Summary: | Set CFP @ 7750'. 10-17-11. Frac'd the Codell 7635’ – 7656’ (42holes) w/ 108,339 gal 22 # Vistar Hybrid cross linked gel containing 250,300 # 20/40 sand. 10-17-11 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7635 ft. | # Of Holes: | 42 | Interval Bottom: | 7656 ft. | Hole Size: | 42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/26/2015 Interval Top: 7409 ft. Interval Bottom: 8148 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 11/21/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/31/2012 | Treatment Summary: | Set CBP @ 7360'. 01-17-12. Drilled out CBP @ 7360', CFP @ 7540', 7750' to commingle the JSND-CDL-NBRR. 01-18-12 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8116 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/31/2012 | Test Method: | flowing | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 10 | BBLS_OIL | 58 | BTU_GAS | 1314 | CALC_BBLS_H2O | 10 | CALC_BBLS_OIL | 58 | CALC_GOR | 5034 | CALC_MCF_GAS | 292 | CASING_PRESS | 1252 | GRAVITY_OIL | 51 | MCF_GAS | 292 | TUBING_PRESS | 563 |
| Perforation Data: | Interval Top: | 7409 ft. | # Of Holes: | 252 | Interval Bottom: | 8148 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 11/1/2023 Interval Top: 7409 ft. Interval Bottom: 7656 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 11/21/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7409 ft. | # Of Holes: | 198 | Interval Bottom: | 7656 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 2/7/2012 Interval Top: 7409 ft. Interval Bottom: 7438 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 11/21/2011 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Date: | 10/17/2011 | Treatment Summary: | Set CFP @ 7540'. 10-17-11. Frac'd the Niobrara 7409’ – 7438’ (156 holes), w/ 131,838 gals 18 # Vistar Hybrid cross linked gel containing 250,060 # 20/40 sand. 10-17-11 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7409 ft. | # Of Holes: | 156 | Interval Bottom: | 7438 ft. | Hole Size: | 42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 459 |
Total Gas Produced (MCF) | 12639 |
GOR | 27535 |
GOR Determination | MCFE |
Average BOE per Day | 7.913 |
Average MCFE per Day | 45.900 |
Federal Financial Assurance | i | |
|
|