401877091 | Form 17 | 12/4/2018 | 12/17/2018 | PLUNGER LIFT | 8 | GAS | -- | 0 | DOWN TO 0 | 798 | 798 | No | -- | -- | Surface casing produced no fluids. Surface casing shut in for 15 minutes ended with 0 PSI. Well and master valve were shut in. |
401753557 | Form 17 | 8/30/2018 | 9/4/2018 | | 133 | GAS | -- | 1 | WHISPER | 800 | 797 | Yes | Yes | -- | Surface casing produced no fluids. Blew down surface casing an extra 30 min ended with a whisper. Surface casing shut in for 15 min ended with a whisper. Well and master shut in. |
400730318 | Form 17 | 9/15/2014 | 11/13/2014 | PLUNGER LIFT | 308 | GAS | -- | 1 | GAS | 2490 | 2498 | No | -- | -- | SC PRODUCED NO FLUIDS, WELL SHUT IN AND DEMCO LOCKED OUT UPON ARRIVAL, EXTRA 30 MIN BLOW DOWN ENDED 0 AND DEAD, SHUT IN FOR 15 MINS, ENDED WITH A WHISPER OF GAS, CHECKED NEXT DAY PRESSURE WAS AT 34 PSI |
400563815 | Form 17 | 1/30/2014 | 2/27/2014 | PLUNGER LIFT | 23 | GAS | -- | <1 | GAS | 371 | 374 | No | -- | -- | SURFACE CASING PRODUCED NO FLUID DURING THE FORM 17 TEST. DEMCO LEAKING FLUID. |
400364696 | Form 17 | 11/5/2012 | 1/4/2013 | PLUNGER LIFT | 49 | GAS | -- | <1 | GAS | 360 | 367 | No | -- | -- | Surface casing produced no fluid during the form 17 test. |