|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 2/1/2019 Measured TD: 8660 ft. Vertical TD: 8564 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 2/1/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/20/2012 | | Proposed Top PZ Location: | Sec:8 Twp: 1N 67W | Footage: 638 FSL 674 FEL | | Bottom Hole Location: | Sec:8 Twp: 1N 67W | Footage: 637 FSL 678 FEL | | Proposed Depth/Form: | 8671 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2SE/4 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: 250-11 , Unit Acreage: 80, Drill Unit: E/2SE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 985 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 690, Top: 0 ft., Bottom: 985 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8671 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8671 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/9/2010 | | Spud Date: | 7/4/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8660 ft. | Measured PB depth: | 8610 ft. | | True Vertical TD: | 8564 ft. | True Vertical PB depth: | 8514 ft. | | Top PZ Location: | Sec:8 Twp: 1N 67W | Footage: 638 FSL 674 FEL | | Bottom Hole Location: | Sec:8 Twp: 1N 67W | Footage: 637 FSL 678 FEL | | Log Types: | Preliminary Form 5 | | Log Types: | CB-GR-CCL,PE-ML,PE-CV-C, PE-CN-DL, PE-AI-LC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1012 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 640, Top: 0 ft., Bottom: 1012 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8647 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 605, Top: 4824 ft., Bottom: 8647 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4394 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 964 ft., Bottom: 4436 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 964 ft., Depth: 4352 ft., Bottom: 4352 ft., Sacks: 500, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4336 ft. | | | | | SUSSEX | 4802 ft. | | | | | NIOBRARA | 7483 ft. | | | | | FORT HAYS | 7801 ft. | | | | | CODELL | 7821 ft. | | | | | J SAND | 8265 ft. | | | | | DAKOTA | 8439 ft. | | | | | LAKOTA | 8540 ft. | | | |
Formation DKTA Formation Classification: Status: AB - 12/13/2010 Interval Top: 8440 ft. Interval Bottom: 8480 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | 9/3/2010 | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/3/2010 | | Treatment Summary: | Frac Dakota down 2-7/8" Tbg w/ Pkr w/ 29,274 gal Vistar w/ 49,640# 20/40, 8,020# SB Excel, 0# .
SET CIBP @ 8410' KB, DUMP 2SX CEMENT
9/3/2010 TURNED WELL ON NEVER PRODUCED AND WENT TO SALES |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DKTA. |
| | Perforation Data: | | Interval Top: | 8440 ft. | # Of Holes: | 64 | | Interval Bottom: | 8480 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: Status: AB - 2/1/2019 Interval Top: 7596 ft. Interval Bottom: 7844 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/11/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/30/2010 | | Treatment Summary: | NB PERF 7596-7698 HOLES 62 SIZE 0.42 CD PERF 7824-7844 HOLES 60 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 237,554 gal Slickwater w/ 200,580# 40/70, 4,400# SB Excel, 0# .
Frac Codell down 4-1/2" Csg w/ 196,476 gal Slickwater w/ 151,900# 40/70, 4,280# SB Excel, 0# . |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/1/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 8 | | BTU_GAS | 1449 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 2625 | | CALC_MCF_GAS | 21 | | CASING_PRESS | 1500 | | GRAVITY_OIL | 40 | | MCF_GAS | 21 |
| | Perforation Data: | | Interval Top: | 7596 ft. | # Of Holes: | 122 | | Interval Bottom: | 7844 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/01/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|