| 404479478 | Form 17 | 12/18/2025 | 12/18/2025 | | 3 | CONTINUOUS | GAS | 0 | NO FLOW | 232 | 232 | No | -- | -- | ANNUAL- Tubing dead. Surface Casing produced no liquid. |
| 404399289 | Form 17 | 10/14/2025 | 10/21/2025 | | 39 | CONTINUOUS | WATER H20 | 0 | NO FLOW | 230 | 230 | No | -- | -- | ANNUAL- Tubing Shut in. Surface Casing produced Water. |
| Click for Specifics | Full | 1/19/2024 | 2/12/2024 | Plunger Lift | 35 | Continuous | None | -- | No Flow | 285 | 285 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 8/10/2023 | 9/11/2023 | Plunger Lift | 24 | Continuous | Water | -- | No Flow | 298 | 298 | No | N | N | Tubing Shut in. Surface Casing produced Water. Water insufficient for sampling. |
| 403500194 | Form 17 | 8/10/2023 | 8/17/2023 | | 24 | CONTINUOUS | WATER H20 | 0 | NO FLOW | 298 | 298 | No | -- | -- | Tubing Shut in. Surface Casing produced Water. Water insufficient for sampling. |
| 403452059 | Form 17 | 6/30/2023 | 7/3/2023 | | 39 | CONTINUOUS | WATER H20 | 1 | WHISPER | 308 | 308 | No | -- | -- | Tubing Shut in. Surface Casing produced Water. |
| Click for Specifics | Full | 8/5/2022 | 11/14/2022 | Plunger Lift | 39 | Continuous | Water | -- | No Flow | 302 | 301 | No | N | N | Tubing Shut in. Surface Casing produced Water. Water insufficient for sampling. |
| 402600447 | Form 17 | 2/12/2021 | 2/16/2021 | | 27 | CONTINUOUS | GAS | 0 | NO FLOW | 1 | 1 | No | -- | -- | Tubing Shut in. Surface Casing produced no liquid. |
| 402556986 | Form 17 | 12/8/2020 | 12/18/2020 | | 36 | CONTINUOUS | GAS | 1 | WHISPER | 294 | 294 | No | -- | -- | Tubing Shut in. Surface Casing produced Water. |
| Click for Specifics | Full | 3/5/2019 | 12/10/2019 | | 0 | Down To Zero | | 0 | Down To Zero | 726 | 726 | No | No | No | Tubing shut in. Surface casing produced no liquid. |
| 400781662 | Form 17 | 1/15/2015 | 1/27/2015 | PLUNGER LIFT | 29 | WATER H20 | -- | 1 | WATER H20 | 1200 | 1199 | No | -- | -- | SC PRODUCED 1 GALLON OF WATER, 30 MIN BLOWDOWN, WHISPER, 15 MIN BUILD UP, 3, GROUND VALVE AND MASTER VALVE CLOSED, AND OPEN TO SALES UPON ARRIVAL. |