|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 10/1/2021 Measured TD: 8405 ft. Vertical TD: 8253 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 10/1/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/10/2012 | | Proposed Top PZ Location: | Sec:8 Twp: 1N 67W | Footage: 664 FNL 680 FEL | | Bottom Hole Location: | Sec:8 Twp: 1N 67W | Footage: 668 FNL 677 FEL | | Proposed Depth/Form: | 8395 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 985 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 690, Top: , Bottom: 985 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8395 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8395 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/18/2010 | | Spud Date: | 7/14/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8405 ft. | Measured PB depth: | 4401 ft. | | True Vertical TD: | 8253 ft. | True Vertical PB depth: | 4249 ft. | | Top PZ Location: | Sec:8 Twp: 1N 67W | Footage: 664 FNL 680 FEL | | Bottom Hole Location: | Sec:8 Twp: 1N 67W | Footage: 668 FNL 677 FEL | | Log Types: | PRELIMINARY FORM 5 | | Log Types: | GR-CCL-CB-VDL; PE/CNLD, AILC, ML, CV | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1010 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 640, Top: 0 ft., Bottom: 1010 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8393 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 555, Top: 4400 ft., Bottom: 8393 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 1150 ft., Depth: 4401 ft., Bottom: 4401 ft., Sacks: 475, Method: DV TOOL | | Additional Cement: | String Type: S.C. 1.1 , Top: 4550 ft., Depth: 8393 ft., Bottom: 8393 ft., Sacks: 555, Method: DV TOOL | | Additional Cement: | String Type: S.C. 1.2 , Top: 1150 ft., Depth: 4401 ft., Bottom: 4401 ft., Sacks: 475, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4304 ft. | 4346 ft. | | | | SUSSEX | 4304 ft. | | | | | NIOBRARA | 7524 ft. | | | | | FORT HAYS | 7814 ft. | | | | | CODELL | 7832 ft. | | | | | J SAND | 8271 ft. | | | |
Formation NB-CD Formation Classification: GW Status: SI - 10/1/2021 Interval Top: 7614 ft. Interval Bottom: 7858 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/12/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/27/2010 | | Treatment Summary: | NBRR Perf 7614-7712 Holes 66 Size 0.42 CODL Perf 7838-7858 Holes 60 Size 0.38
Frac NBRR w/ 252 gal 15% HCl & 249,816 gal SW & 201,460# 40/70 sand & 4,000# SuperLC.
Frac CODL w/ 200,760 gal SW & 152,560# 40/70 sand & 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/1/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 39 | | BTU_GAS | 1289 | | CALC_BBLS_OIL | 39 | | CALC_GOR | 6359 | | CALC_MCF_GAS | 248 | | CASING_PRESS | 1200 | | GRAVITY_OIL | 50 | | MCF_GAS | 248 |
| | Perforation Data: | | Interval Top: | 7614 ft. | # Of Holes: | 126 | | Interval Bottom: | 7858 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 09/30/2021 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|