| 404309515 | Form 17 | 7/30/2025 | 8/7/2025 | FLOWING | 0 | NO FLOW | NONE | 0 | NO FLOW | 200 | 200 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
| Click for Specifics | Light | 1/28/2025 | 2/3/2025 | | 0 | | -- | 0 | | 567 | 567 | No | No | No | |
| Click for Specifics | Full | 1/10/2024 | 1/18/2024 | Shut In | 0 | Down to Zero | -- | 0 | Down to Zero | 561 | 561 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/9/2023 | 3/27/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 759 | 759 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 7/26/2022 | 8/9/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 960 | 960 | No | None | None | |
| Click for Specifics | Full | 6/16/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 688 | 688 | No | None | None | |
| Click for Specifics | Light | 8/23/2020 | 12/3/2020 | | 0 | | -- | 0 | No Flow | 865 | 865 | No | No | No | |
| Click for Specifics | Light | 6/12/2019 | 11/27/2019 | | 25 | | | 0 | No Flow | 269 | 269 | No | No | No | |
| 400415586 | Form 17 | 4/29/2013 | 5/8/2013 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 307 | 344 | No | -- | -- | Surface casing produced no fluid during the form 17 test. |