|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 9/3/2025 Measured TD: 8096 ft. Vertical TD: 7980 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 9/3/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/6/2012 | | Proposed Top PZ Location: | Sec:36 Twp: 5N 67W | Footage: 70 FNL 1330 FWL | | Bottom Hole Location: | Sec:36 Twp: 5N 67W | Footage: 70 FNL 1330 FWL | | Proposed Depth/Form: | 8052 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | STATE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: 25: S2SW; 36: N2NW | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: 25: S2SW; 36: N2NW | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 595, Top: , Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8052 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8052 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/12/2010 | | Spud Date: | 7/9/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8096 ft. | Measured PB depth: | 8049 ft. | | True Vertical TD: | 7980 ft. | True Vertical PB depth: | 7933 ft. | | Top PZ Location: | Sec:36 Twp: 5N 67W | Footage: 91 FNL 1303 FWL | | Bottom Hole Location: | Sec:36 Twp: 5N 67W | Footage: 93 FNL 1307 FWL | | Log Types: | PRELIMINARY FORM 5 | | Log Types: | P/E AILC-CNDL-ML-CV, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 881 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 881 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8086 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 980, Top: 930 ft., Bottom: 8086 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3838 ft. | | | | | SUSSEX | 4446 ft. | | | | | NIOBRARA | 7175 ft. | | | | | FORT HAYS | 7479 ft. | | | | | CODELL | 7500 ft. | | | | | J SAND | 7947 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 9/3/2025 Interval Top: 7954 ft. Interval Bottom: 7978 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/5/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/14/2010 | | Treatment Summary: | Frac J Sand w/ 139,545 gal SW w/ 115,180# 40/70 & 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/14/2010 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 16 | | BTU_GAS | 1267 | | CALC_BBLS_OIL | 16 | | CALC_GOR | 18188 | | CALC_MCF_GAS | 291 | | CASING_PRESS | 2900 | | GRAVITY_OIL | 57 | | MCF_GAS | 291 |
| | Perforation Data: | | Interval Top: | 7954 ft. | # Of Holes: | 72 | | Interval Bottom: | 7978 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/3/2025 Interval Top: 7176 ft. Interval Bottom: 7506 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/5/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/29/2010 | | Treatment Summary: | Perf NB 7176-7384 Holes 62 Size 0.42 Perf CD 7486-7506 Holes 60 Size 0.42
Frac NB 9/29/10 w/ 250 gal 15% HCl & 238,526 gal SW w/ 201,080# 40/70 & 4,300# SB Excel.
Frac CD 9/29/10 w/ 201,069 gal SW w/ 151,260# 40/70 & 4,100# SB Excel.
Frac CD 9/27/10 w/ 18,746 gal SW -Job not completed due to mechanical issues. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/14/2010 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 16 | | BTU_GAS | 1267 | | CALC_BBLS_OIL | 16 | | CALC_GOR | 18188 | | CALC_MCF_GAS | 291 | | CASING_PRESS | 2900 | | GRAVITY_OIL | 56 | | MCF_GAS | 291 |
| | Perforation Data: | | Interval Top: | 7176 ft. | # Of Holes: | 122 | | Interval Bottom: | 7506 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/03/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 228 |
| Total Gas Produced (MCF) | 3107 |
| GOR | 13627 |
| GOR Determination | BOE |
| Average BOE per Day | 2.107 |
| Average MCFE per Day | 12.204 |
| Federal Financial Assurance | i | |
|
|