| 404375891 | Form 17 | 9/15/2025 | 10/1/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 1050 | 1050 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
| Click for Specifics | Light | 1/16/2025 | 1/28/2025 | | 0 | | -- | 0 | | 900 | 900 | No | No | No | |
| Click for Specifics | Full | 2/26/2024 | 3/19/2024 | Plunger Lift | 0 | Down to Zero | -- | 0 | Down to Zero | 485 | 485 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 2/22/2023 | 3/27/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 590 | 590 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 3/31/2022 | 4/18/2022 | | 0 | No Flow | -- | 0 | No Flow | 571 | 572 | No | No | No | |
| 402898141 | Form 17 | 10/23/2021 | 12/14/2021 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 605 | 605 | No | -- | -- | Annual Test, 0 psi with no pressure or flow observed for the entire 30 minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Light | 10/2/2020 | 12/3/2020 | | 1 | | -- | 0 | No Flow | 498 | 498 | No | No | No | |
| Click for Specifics | Light | 5/30/2019 | 8/18/2020 | | 2 | | -- | 0 | | 622 | 622 | No | No | No | |