|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/7/2025 Measured TD: 7300 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/7/2025 | | Wellbore Permit | DRIFTED | | Permit #: | 20085139 | Expiration Date: | 10/15/2009 | | Proposed Depth/Form: | 7620 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2NE4 | | Formation And Spacing: | Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 80, Drill Unit: W2NE4 |
| | |
| Wellbore Completed | | Completion Date: | 9/29/2009 | | Spud Date: | 9/25/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 7300 ft. | Measured PB depth: | 7251 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, CNL/CDL, DUAL INDUCTION | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 511 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 511 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7282 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6200 ft., Bottom: 7282 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6180 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 685, Top: 0 ft., Bottom: 6180 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6800 ft. | | N | N | | FORT HAYS | 7111 ft. | | N | N | | CODELL | 7132 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 12/31/2009 Interval Top: 7135 ft. Interval Bottom: 7143 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/15/2009 | | Treatment Summary: | FRACD WITH 643 BBLS SILVERSTIM 22# PAD, 1957 BBLS SILVERSTIM 22# FLUID SYSTEM, 217680 LBS 30/50 WHITE SAND AND 8000 LBS OF SB EXCEL 20/40 RESIN COATED PROPPANT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7135 ft. | # Of Holes: | 24 | | Interval Bottom: | 7143 ft. | Hole Size: | 0.34 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/7/2025 Interval Top: 6806 ft. Interval Bottom: 7143 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/5/2009 | Choke Size: | 0.250 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/15/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/1/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 61 | | BTU_GAS | 1254 | | CALC_BBLS_H2O | 1 | | CALC_BBLS_OIL | 61 | | CALC_GOR | 2803 | | CALC_MCF_GAS | 171 | | CASING_PRESS | 1468 | | GRAVITY_OIL | 46 | | MCF_GAS | 171 |
| | Perforation Data: | | Interval Top: | 6806 ft. | # Of Holes: | 46 | | Interval Bottom: | 7143 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 12/31/2009 Interval Top: 6806 ft. Interval Bottom: 6920 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/15/2009 | | Treatment Summary: | PERFD NIO A 6806-6808 (4 HOLES) NIO B 6914-6920 (18). FRACD W/ 24 BBLS 15% HCL, 1667 BBLS SLICKWATER PAD, 145 BBLS SILVERSTIM 20# PAD, 2228 BBLS SILVERSTIM 20# GEL FLUID SYSTEM, 238040 LBS 30/50 WHITE SAND AND 12000 LBS SB EXCEL 20/40 RCP |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6806 ft. | # Of Holes: | 22 | | Interval Bottom: | 6920 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/07/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 03/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|