| 402418265 | Form 17 | 3/12/2020 | 6/10/2020 | | 21 | CONTINUOUS | -- | 21 | | 172 | -- | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402455816 | Form 17 | 11/22/2019 | 7/29/2020 | SHUT-IN | 39 | DOWN TO 0 | -- | 0 | NO FLOW | 480 | 480 | No | -- | -- | 2019 Annual TEst, 39 PSI blew down ti 0 PSI instantly, no pressure or flow observed for the remainder of the test. PDC has completed an abatement system install follow up test and initial pressure was 21 PSI. PDC will continue to monitor pressure and re-test in 6 months. |
| Click for Specifics | Light | 11/21/2019 | 8/18/2020 | | 0 | | -- | 0 | | 487 | 487 | No | No | No | |