Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-28160
Well Classification: OW Status: PA - 5/29/2020
Well Name/No:Sater #19-NU
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/29/2020
FacilityID:298018LocationID:302332
County:WELD #123Location:SENW 19 4N63W 6
Field:WATTENBERG - #90750Elevation:4670 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1385FNL  2481 FWLLat/Long: 40.301080 / -104.480860Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.301010 / -104.480830Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 5/29/2020             Measured TD: 6885 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 5/29/2020
Wellbore Permit
Permit #:Expiration Date:10/28/2010
Proposed Depth/Form:7700 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:11/23/2009
Spud Date:11/20/2009Spud Date Is:ACTUAL
Measured TD:6885 ft.Measured PB depth:6825 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CNL/CDL, DUAL INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 523 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 0 ft., Bottom: 523 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6877 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 711, Top: 0 ft., Bottom: 6877 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6441 ft.NN
FORT HAYS6686 ft.NN
CODELL6710 ft.NN

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 5/29/2020                 Interval Top: 6451 ft.    Interval Bottom: 6718 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/15/2009Choke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/9/2009
Treatment Summary:NB- A 6451-6453 (4 HOLES), NB- B 6518-6524 (12 HOLES), CD 6712-6718 (12 HOLES). FRACD NB-CD USING 24 BBLS 15% HCL, 952 BBLS SLICKWTR PAD, 953 BBLS QUADRA 26# PAD, 2816 BBLS QUADRA 26# FLUID SYSTEM, 334780 LBS 20/40 WHT SND& 16180 LBS OF SB EXCEL 20/40 RCP
Tubing Size:2.375 in.Tubing Setting Depth:6697 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/1/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 19
BTU_GAS 1274
CALC_BBLS_H2O 4
CALC_BBLS_OIL 19
CALC_GOR 4895
CALC_MCF_GAS 93
CASING_PRESS 503
GRAVITY_OIL 49
MCF_GAS 93
Perforation Data:
Interval Top:6451 ft.# Of Holes:28
Interval Bottom:6718 ft.Hole Size:0.39 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/29/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No