402028597 | Form 17 | 4/23/2019 | 5/1/2019 | PLUNGER LIFT | 50 | GAS | -- | 0 | DOWN TO 0 | -- | -- | Yes | -- | -- | Surface casing produed no fluid. Well shut in for 15min ended with a whisper. Surface casing blown down an extra 30min ended with a whisper. Tubing and casing shut in. |
401352093 | Form 17 | 7/7/2017 | 7/24/2017 | | 66 | GAS | -- | 1 | WHISPER | -- | -- | No | -- | -- | SC PRODUCED NO FLUID. BLEW DOWN SC AN ADDITIONAL 30 MINS, ENDED AT A WHISPER. SHUT IN SC FOR 15 MINS, BUILT UP TO 5 PSI. TUBING AND CASING WERE LOTO UPON ARRIVAL. |
400521397 | Form 17 | 10/2/2013 | 12/3/2013 | PLUNGER LIFT | 280 | GAS | -- | 81 | GAS | 795 | 796 | No | -- | -- | SURFACE CASING PRODUCED 45 GALLONS H20 IN 6 HRS OF BLOWING DOWN. BLEW SC DOWN FOR RE-PLUMB. |
400318153 | Form 17 | 7/16/2012 | 8/20/2012 | PLUNGER LIFT | 231 | GAS | -- | 142 | GAS | 428 | 438 | No | -- | -- | Surface casing produced no fluid during the form 17 test. |