|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/16/2019 Measured TD: 8296 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/16/2019 | | Wellbore Permit | DRIFTED | | Permit #: | 20082149 | Expiration Date: | 6/23/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1980 FSL 1980 FEL | | Bottom Hole Location: | Sec:6 Twp: 1N 68W | Footage: 1980 FSL 1980 FEL | | Proposed Depth/Form: | 8285 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N/2SE4 |
| | |
| Wellbore Completed | | Completion Date: | 1/13/2009 | | Spud Date: | 1/9/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8296 ft. | Measured PB depth: | 8254 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CAL-CDL-CNL-ML-DIL-GR | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 669 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 460, Top: 0 ft., Bottom: 669 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8284 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 778, Top: 3996 ft., Bottom: 8284 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1071 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 105, Top: 690 ft., Bottom: 1112 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 1560 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 245, Top: 1160 ft., Bottom: 1610 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3995 ft. | | N | N | | SUSSEX | 4428 ft. | | N | N | | SHANNON | 4983 ft. | | N | N | | NIOBRARA | 7379 ft. | | N | N | | FORT HAYS | 7700 ft. | | N | N | | CODELL | 7719 ft. | | N | N | | J SAND | 8150 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 8/25/2009 Interval Top: 7720 ft. Interval Bottom: 7738 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/17/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/2/2009 | | Treatment Summary: | 194,000 GALS FLUID & 152,000# 30/50 SAND & 4,000# 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7720 ft. | # Of Holes: | 54 | | Interval Bottom: | 7738 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/17/2019 Interval Top: 7472 ft. Interval Bottom: 7738 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/13/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1280 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 42 | | CALC_GOR | 8980 | | CALC_MCF_GAS | 377 | | CASING_PRESS | 600 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7472 ft. | # Of Holes: | 102 | | Interval Bottom: | 7738 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 8/25/2009 Interval Top: 7472 ft. Interval Bottom: 7602 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/17/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/3/2009 | | Treatment Summary: | 500 GALS ACID & 226,000 GALS FLUID & 148,000# 30/50 SAND & 4,000# 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7472 ft. | # Of Holes: | 48 | | Interval Bottom: | 7602 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/17/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|