| Click for Specifics | Full | 1/28/2019 | 12/10/2019 | | 1 | Down To Zero | | 0 | Down To Zero | 548 | 548 | No | No | No | Tubing shut in. Surface casing produced no liquid. |
| 401861172 | Form 17 | 12/3/2018 | 12/4/2018 | | 1 | WHISPER | -- | 0 | DOWN TO 0 | -- | -- | No | -- | -- | Surface casing produced no fluids. Surface casing shut in for 15 min ended with 0 PSI. Both tubing and casing were LOTO. |
| 400852027 | Form 17 | 6/1/2015 | 6/11/2015 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 1125 | 1124 | No | -- | -- | SC PRODUCED NO FLUID. POST REMEDIATION TEST. INITIAL TEST SHOWED 22 PSI WITH GAS AND BLEW DEAD IN 5 MINS. AFTER A 15 MIN SHUT-IN DURING INITIAL TEST THE WELL WHISPERED. |
| 400526596 | Form 17 | 11/4/2013 | 12/13/2013 | PLUNGER LIFT | 146 | GAS | -- | 28 | GAS | 315 | 341 | No | -- | -- | SURFACE CASING PRODUCED NO FLUID DURING TEST. BLEW DOWN WELL FOR AN ADDITIONAL 30 MINS, PRESSURE ENDED AT #26 |