|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 2/21/2019 Measured TD: 8110 ft. Vertical TD: 8004 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 2/21/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/29/2012 | | Proposed Top PZ Location: | Sec:34 Twp: 3N 66W | Footage: 1511 FNL 2569 FWL | | Bottom Hole Location: | Sec:34 Twp: 3N 66W | Footage: 1511 FNL 2569 FWL | | Proposed Depth/Form: | 8110 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 945 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 420, Top: 12 ft., Bottom: 945 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8097 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 720, Top: 4084 ft., Bottom: 8097 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 5/17/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8110 ft. | Measured PB depth: | 8067 ft. | | True Vertical TD: | 8004 ft. | True Vertical PB depth: | 7962 ft. | | Top PZ Location: | Sec:34 Twp: 3N 66W | Footage: 1511 FNL 2569 FWL | | Bottom Hole Location: | Sec:34 Twp: 3N 66W | Footage: 1511 FNL 2569 FWL | | Log Types: | CBL, CDL/CNL/ML, DIL/GL/GR | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 945 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 0 ft., Bottom: 945 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8097 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 720, Top: 4084 ft., Bottom: 8097 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1205 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 85, Top: 866 ft., Bottom: 1250 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 866 ft., Depth: 8097 ft., Bottom: 1250 ft., Sacks: 85, Method: NON CEMENT SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4065 ft. | | N | N | | SUSSEX | 4510 ft. | 4700 ft. | N | N | | NIOBRARA | 7245 ft. | | N | N | | FORT HAYS | 7500 ft. | | N | N | | CODELL | 7523 ft. | | N | N | | J SAND | 7968 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 2/21/2019 Interval Top: 7970 ft. Interval Bottom: 8034 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/30/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/17/2010 | | Treatment Summary: | Frac JSND w/ 157,332 gal SW & 115,360# 40/70 sand & 4,000# SB Excel. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7939 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/10/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 21 | | BTU_GAS | 1250 | | CALC_BBLS_OIL | 21 | | CALC_GOR | 4857 | | CALC_MCF_GAS | 102 | | CASING_PRESS | 987 | | GRAVITY_OIL | 50 | | MCF_GAS | 102 | | TUBING_PRESS | 820 |
| | Perforation Data: | | Interval Top: | 7970 ft. | # Of Holes: | 76 | | Interval Bottom: | 8034 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 10/18/2010 Interval Top: 7525 ft. Interval Bottom: 7541 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/29/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/5/2008 | | Treatment Summary: | 169,640 GALS FLUID & 116,420# 30/50 SAND & 4000# SB EXCEL SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7525 ft. | # Of Holes: | 64 | | Interval Bottom: | 7541 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/21/2019 Interval Top: 7298 ft. Interval Bottom: 7541 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/29/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/30/2010 | | Treatment Summary: | NBRR Perf 7298-7398 Holes 116 Size 0.42 CODL Perf 7525-7541 Holes 64 Size 0.38
No additional treatment. | | Formation Treatment | | Treatment Date: | 5/24/2008 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7939 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/10/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 21 | | BTU_GAS | 1250 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 21 | | CALC_GOR | 4857 | | CALC_MCF_GAS | 102 | | CASING_PRESS | 987 | | GRAVITY_OIL | 50 | | MCF_GAS | 102 | | TUBING_PRESS | 820 |
| | Perforation Data: | | Interval Top: | 7298 ft. | # Of Holes: | 180 | | Interval Bottom: | 7541 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/18/2010 Interval Top: 7298 ft. Interval Bottom: 7398 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/29/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/5/2008 | | Treatment Summary: | 334,347 GALS FLUID & 253,140# 30/50 SAND & 8000# SB EXCEL SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7298 ft. | # Of Holes: | 116 | | Interval Bottom: | 7398 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/21/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|