| 403353958 | Form 17 | 3/22/2023 | 3/23/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
| Click for Specifics | Full | 1/27/2022 | 2/21/2022 | | 0 | No Flow | -- | 0 | Down to Zero | 370 | 370 | No | No | No | |
| Click for Specifics | Full | 9/11/2021 | 12/21/2021 | | 22 | Continuous | None | 7 | Continuous | 275 | 275 | No | None | None | |
| 402418334 | Form 17 | 3/9/2020 | 6/10/2020 | | 3 | DOWN TO 0 | -- | 0 | NO FLOW | 320 | 320 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402270285 | Form 17 | 12/12/2019 | 12/23/2019 | FLOWING | 12 | DOWN TO 0 | -- | 0 | NO FLOW | 460 | 460 | No | -- | -- | Annaul TEst 12 PSI blew down to 0 PSI instantly. No pressure or flow observed for the remainder of test. |
| Click for Specifics | Light | 11/21/2019 | 8/18/2020 | | 12 | | -- | 0 | | 460 | 460 | No | No | No | |