|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 6/13/2023 Measured TD: 6926 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 6/13/2023 | | Wellbore Permit | DRIFTED | | Permit #: | 20071924 | Expiration Date: | 5/17/2008 | | Proposed Depth/Form: | 7750 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NW4 |
| | |
| Wellbore Completed | | Completion Date: | 9/20/2007 | | Spud Date: | 9/17/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 6926 ft. | Measured PB depth: | 6889 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, CD/CN/DIL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 536 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 380, Top: 0 ft., Bottom: 536 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6914 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 625, Top: 0 ft., Bottom: 6914 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4136 ft. | | N | N | | NIOBRARA | 6507 ft. | | N | N | | FORT HAYS | 6704 ft. | | N | N | | CODELL | 6729 ft. | | N | N |
Formation NB-CD Formation Classification: OW Status: AB - 6/13/2023 Interval Top: 6578 ft. Interval Bottom: 6740 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/7/2007 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/16/2007 | | Treatment Summary: | NBRR PERF 6578-6594' (8 SHOTS) & CODL PERFS 6732-6740' (16 HOLES); FRAC NBRR/CODELL W/500 GAL OF 15% HCL, 965 BBL SLICKWATER PAD, 3476 BBL VISTAR 20# FLUID SYSTEM 337740 LBS 20/40 WHITE SAND AND 16000 LBS SB EXCEL 20/40 RESIN COATED PROPPANT |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 50 | | BTU_GAS | 1345 | | CALC_BBLS_H2O | 2 | | CALC_BBLS_OIL | 50 | | CALC_GOR | 2120 | | CALC_MCF_GAS | 106 | | CASING_PRESS | 975 | | GRAVITY_OIL | 49 | | MCF_GAS | 106 |
| | Perforation Data: | | Interval Top: | 6578 ft. | # Of Holes: | 24 | | Interval Bottom: | 6740 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/13/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|