| 403969529 | Form 17 | 10/22/2024 | 10/24/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 550 | 550 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
| Click for Specifics | Full | 2/2/2024 | 2/19/2024 | Shut In | 0 | Down to Zero | -- | 0 | Down to Zero | 470 | 470 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 2/6/2023 | 2/13/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 480 | 480 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 4/20/2022 | 5/9/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 500 | 500 | No | No | No | |
| Click for Specifics | Full | 4/19/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 500 | 500 | No | None | None | |
| Click for Specifics | Light | 7/30/2020 | 12/3/2020 | | 0 | | -- | 0 | No Flow | 240 | 240 | No | No | No | |
| Click for Specifics | Light | 4/16/2019 | 8/18/2020 | | 1 | | -- | 0 | | 130 | 130 | No | No | No | |