Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24311
Well Classification: GW Status: PA - 11/12/2024
Well Name/No:MEINING #1-30B
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/12/2024
FacilityID:287396LocationID:332829
County:WELD #123Location:SENE 30 4N66W 6
Field:WATTENBERG - #90750Elevation:4759 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2017FNL  720 FELLat/Long: 40.284510 / -104.813530Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.284500 / -104.813530Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 11/12/2024             Measured TD: 7585 ft.    Vertical TD: 7430 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 11/12/2024
Wellbore PermitDIRECTIONAL
Permit #:20064498 Expiration Date:10/15/2007
Proposed Top PZ Location:Sec:30 Twp: 4N 66W Footage: 1188 FNL  2 FEL
Bottom Hole Location:Sec:30 Twp: 4N 66W Footage: 1188 FNL  2 FEL
Proposed Depth/Form:7561 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407.87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:1/2/2007
Spud Date:12/18/2006Spud Date Is:ACTUAL
Measured TD:7585 ft.Measured PB depth:7529 ft.
True Vertical TD:7430 ft.True Vertical PB depth:7374 ft.
Top PZ Location:Sec:30 Twp: 4N 66WFootage: 1188 FNL  2 FEL
Bottom Hole Location:Sec:30 Twp: 4N 66WFootage: 1188 FNL  2 FEL
Log Types:CD/CN/DIL, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 422 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 422 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7571 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1070, Top: 0 ft., Bottom: 7571 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7107 ft.NN
CODELL7418 ft.NN

Formation CODL                     Formation Classification:  OG                     Status:  CM - 6/29/2017                 Interval Top: 7418 ft.    Interval Bottom: 7432 ft.

 Completed Information for Formation CODELL
1st Production Date:2/17/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/10/2017Treatment End Date:N/A
Treatment Summary:12/4/14 drilled out cement and plug that had been placed over the Codell for the Niobrara recomplete and commingled the Niobrara and Codell formations.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:2/6/2007
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 4
BTU_GAS 1260
CALC_GOR 12500
CASING_PRESS 150
GRAVITY_OIL 58
MCF_GAS 50
TUBING_PRESS 100
Perforation Data:
Interval Top:7418 ft.# Of Holes:84
Interval Bottom:7432 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OG                   Status:  AB - 11/12/2024                Interval Top: 7062 ft.    Interval Bottom: 7432 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/8/2014Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:1/18/2015Treatment End Date:N/A
Treatment Summary:12/4/2014 Drilled out cement and CIBP over Codell and commingled Niobrara and Codell formations.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7410 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/18/2015Test Method:plunger lift
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 1
BTU_GAS 1281
CALC_BBLS_OIL 1
CALC_GOR 25000
CALC_MCF_GAS 25
CASING_PRESS 360
GRAVITY_OIL 60
MCF_GAS 25
TUBING_PRESS 350
Perforation Data:
Interval Top:7062 ft.# Of Holes:462
Interval Bottom:7432 ft.Hole Size:

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 6/29/2017                 Interval Top: 7062 ft.    Interval Bottom: 7250 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/15/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/10/2017Treatment End Date:N/A
Treatment Summary:12/4/2014 cleaned out sand and pulled plug that had been set over Niobrara on 9/16/14 for offset horizontal frac.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:2/15/2008
Treatment Summary:FRAC'D W/ 4,474 BBLS FRAC FLUID & 238,260# OTTAWA 30/50 SAND & 12,000# SB EXCEL 12/20 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 48
BBLS_OIL 56
BTU_GAS 1312
CALC_GOR 9821
CASING_PRESS 150
GRAVITY_OIL 60
MCF_GAS 550
TUBING_PRESS 120
Perforation Data:
Interval Top:7062 ft.# Of Holes:378
Interval Bottom:7250 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/12/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No