Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24311
Well Classification: GW Status: PA - 11/12/2024
Well Name/No:MEINING #1-30B
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/12/2024
FacilityID:287396LocationID:332829
County:WELD #123Location:SENE 30 4N66W 6
Field:WATTENBERG - #90750Elevation:4759 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2017FNL  720 FELLat/Long: 40.284510 / -104.813530Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.284500 / -104.813530Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 11/12/2024             Measured TD: 7585 ft.    Vertical TD: 7430 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 11/12/2024
Wellbore PermitDIRECTIONAL
Permit #:20064498 Expiration Date:10/15/2007
Proposed Top PZ Location:Sec:30 Twp: 4N 66W Footage: 1188 FNL  2 FEL
Bottom Hole Location:Sec:30 Twp: 4N 66W Footage: 1188 FNL  2 FEL
Proposed Depth/Form:7561 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407.87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:1/2/2007
Spud Date:12/18/2006Spud Date Is:ACTUAL
Measured TD:7585 ft.Measured PB depth:7529 ft.
True Vertical TD:7430 ft.True Vertical PB depth:7374 ft.
Top PZ Location:Sec:30 Twp: 4N 66WFootage: 1188 FNL  2 FEL
Bottom Hole Location:Sec:30 Twp: 4N 66WFootage: 1188 FNL  2 FEL
Log Types:CD/CN/DIL, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 422 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 422 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7571 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1070, Top: 0 ft., Bottom: 7571 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7107 ft.NN
CODELL7418 ft.NN

Formation CODL                     Formation Classification:  OG                     Status:  CM - 6/29/2017                 Interval Top: 7418 ft.    Interval Bottom: 7432 ft.

 Completed Information for Formation CODELL
1st Production Date:2/17/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/10/2017Treatment End Date:N/A
Treatment Summary:12/4/14 drilled out cement and plug that had been placed over the Codell for the Niobrara recomplete and commingled the Niobrara and Codell formations.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:2/6/2007
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 4
BTU_GAS 1260
CALC_GOR 12500
CASING_PRESS 150
GRAVITY_OIL 58
MCF_GAS 50
TUBING_PRESS 100
Perforation Data:
Interval Top:7418 ft.# Of Holes:84
Interval Bottom:7432 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OG                   Status:  AB - 11/12/2024                Interval Top: 7062 ft.    Interval Bottom: 7432 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/8/2014Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:1/18/2015Treatment End Date:N/A
Treatment Summary:12/4/2014 Drilled out cement and CIBP over Codell and commingled Niobrara and Codell formations.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7410 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/18/2015Test Method:plunger lift
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 1
BTU_GAS 1281
CALC_BBLS_OIL 1
CALC_GOR 25000
CALC_MCF_GAS 25
CASING_PRESS 360
GRAVITY_OIL 60
MCF_GAS 25
TUBING_PRESS 350
Perforation Data:
Interval Top:7062 ft.# Of Holes:462
Interval Bottom:7432 ft.Hole Size:

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 6/29/2017                 Interval Top: 7062 ft.    Interval Bottom: 7250 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/15/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/10/2017Treatment End Date:N/A
Treatment Summary:12/4/2014 cleaned out sand and pulled plug that had been set over Niobrara on 9/16/14 for offset horizontal frac.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:2/15/2008
Treatment Summary:FRAC'D W/ 4,474 BBLS FRAC FLUID & 238,260# OTTAWA 30/50 SAND & 12,000# SB EXCEL 12/20 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 48
BBLS_OIL 56
BTU_GAS 1312
CALC_GOR 9821
CASING_PRESS 150
GRAVITY_OIL 60
MCF_GAS 550
TUBING_PRESS 120
Perforation Data:
Interval Top:7062 ft.# Of Holes:378
Interval Bottom:7250 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/12/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No