| Click for Specifics | Full | 10/16/2025 | 11/11/2025 | | 0 | No Flow | None | 0 | No Flow | 340 | 340 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 1/17/2024 | 2/12/2024 | Plunger Lift | 1 | Whisper | None | -- | No Flow | 411 | 411 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 6/8/2023 | 7/17/2023 | Plunger Lift | 1 | Whisper | None | -- | No Flow | 368 | 368 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 9/7/2022 | 10/10/2022 | Plunger Lift | 0 | No Flow | None | -- | No Flow | 380 | 380 | No | N | N | Surface Casing produced no liquid. |
| Click for Specifics | Full | 9/7/2022 | 11/14/2022 | Plunger Lift | 2 | Continuous | None | -- | No Flow | 415 | 415 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 2/19/2021 | 3/15/2021 | Plunger Lift | 0 | No Flow | None | -- | No Flow | 459 | 459 | No | No | No | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 1/21/2020 | 6/8/2020 | | 0 | Down To Zero | | 0 | Down To Zero | 964 | 964 | No | No | No | Tubing shut in. Surface casing produced no liquid. |
| Click for Specifics | Full | 2/21/2019 | 12/10/2019 | | 7 | Gas | | 0 | Down To Zero | 307 | 314 | No | No | No | Surface casing produced no liquid. |
| 400868645 | Form 17 | 6/18/2015 | 7/15/2015 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 968 | 968 | No | -- | -- | POST REMEDIATION TEST. INITIAL POST REMEDIATION BLOW DOWN ON 6-11-15 STARTED WITH A WHISPER AND BLEW DOWN TO ZERO PSI. SC DID NOT PRODUCE ANY FLUID. 15 MIN BUILD UP, DEAD |
| 400317308 | Form 17 | 7/31/2012 | 8/17/2012 | PLUNGER LIFT | 248 | GAS | -- | 229 | GAS | 375 | 382 | No | -- | -- | No fluid was produced during form 17 test. No transducer to surface casing. |