|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 6/1/2022 Measured TD: 7590 ft. Vertical TD: 7523 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 6/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20072578 | Expiration Date: | 6/5/2008 | | Proposed Top PZ Location: | Sec:22 Twp: 3N 66W | Footage: 1266 FSL 79 FEL | | Bottom Hole Location: | Sec:22 Twp: 3N 66W | Footage: 1266 FSL 79 FEL | | Proposed Depth/Form: | 7583 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 6/28/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7590 ft. | Measured PB depth: | 7552 ft. | | True Vertical TD: | 7523 ft. | True Vertical PB depth: | 7485 ft. | | Top PZ Location: | Sec:22 Twp: 3N 66W | Footage: 1266 FSL 79 FEL | | Bottom Hole Location: | Sec:22 Twp: 3N 66W | Footage: 1266 FSL 79 FEL | | Log Types: | CDL - CNL - CBL - DIL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 726 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 110, Top: 0 ft., Bottom: 726 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 12 ft., Depth: 7583 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 3770 ft., Bottom: 7583 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 3700 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 760, Top: 480 ft., Bottom: 3700 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4078 ft. | | N | N | | SUSSEX | 4458 ft. | | N | N | | SHANNON | 5034 ft. | | N | N | | NIOBRARA | 7145 ft. | | N | N | | FORT HAYS | 7399 ft. | | N | N | | CODELL | 7421 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 9/10/2007 Interval Top: 7420 ft. Interval Bottom: 7440 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/21/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/27/2007 | | Treatment Summary: | 170,987 GALS FLUID & 115,620 LBS 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7420 ft. | # Of Holes: | 60 | | Interval Bottom: | 7440 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 6/1/2022 Interval Top: 7160 ft. Interval Bottom: 7440 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/21/2007 | Choke Size: | 0.156 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/30/2007 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/10/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1285 | | CALC_BBLS_OIL | 51 | | CALC_GOR | 7370 | | CALC_MCF_GAS | 376 | | CASING_PRESS | 1400 | | GRAVITY_OIL | 53 |
| | Perforation Data: | | Interval Top: | 7160 ft. | # Of Holes: | 124 | | Interval Bottom: | 7440 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 9/10/2007 Interval Top: 7160 ft. Interval Bottom: 7304 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/21/2007 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/28/2007 | | Treatment Summary: | 240,799 GALS FLUID & 200,880 LBS 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7160 ft. | # Of Holes: | 64 | | Interval Bottom: | 7304 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 05/31/2022 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|