| 404127500 | Form 17 | 2/28/2025 | 3/13/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 850 | 0 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
| Click for Specifics | Light | 1/14/2025 | 1/28/2025 | | 0 | | -- | 0 | | 817 | 817 | No | No | No | |
| Click for Specifics | Full | 1/29/2024 | 2/5/2024 | Shut In | 0 | No Flow | -- | 0 | No Flow | 740 | 740 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 5/26/2023 | 6/5/2023 | Shut-In | 0 | Down to Zero | -- | 0 | Down to Zero | 680 | 680 | No | None | None | |
| Click for Specifics | Full | 4/26/2022 | 5/9/2022 | | 0 | No Flow | -- | 0 | No Flow | 538 | 538 | No | No | No | |
| Click for Specifics | Full | 9/16/2021 | 11/1/2021 | | 0 | Down to Zero | -- | 0 | No Flow | 230 | 163 | No | None | None | |
| Click for Specifics | Light | 10/20/2020 | 12/3/2020 | | 0 | | -- | 0 | No Flow | 198 | 198 | No | No | No | |
| Click for Specifics | Light | 7/12/2019 | 8/18/2020 | | 0 | | -- | 0 | | 166 | 166 | No | No | No | |