Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22377
Well Classification: OW Status: PA - 4/8/2025
Well Name/No:CECIL #21-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/8/2025
FacilityID:273559LocationID:332494
County:WELD #123Location:NENW 12 6N64W 6
Field:WATTENBERG - #90750Elevation:4720 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:851FNL  2170 FWLLat/Long: 40.505744 / -104.500004Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.505610 / -104.499970Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 4/8/2025             Measured TD: 7166 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 4/8/2025
Wellbore Permit
Permit #:20041747 Expiration Date:9/1/2005
Proposed Depth/Form:8080 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DK-J , Formation: DAKOTA-JSND , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2NW4
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 8080 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 3580 ft., Bottom: 6580 ft.

Wellbore Completed
Completion Date:2/15/2005
Spud Date:12/10/2004Spud Date Is:ACTUAL
Measured TD:7166 ft.Measured PB depth:7141 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMP.DEN.,COMP.NEU, DUAL IND,.GR,CBL,CCL,VDL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 497 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 497 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7141 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 5735 ft., Bottom: 7141 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5735 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 327, Top: 3034 ft., Bottom: 5735 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2970 ft.NN
PARKMAN3555 ft.NN
SUSSEX3960 ft.NN
SHANNON4325 ft.NN
NIOBRARA6600 ft.NN
FORT HAYS6862 ft.NN
CODELL6898 ft.NN
CARLILE6914 ft.NN
GREENHORN6946 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/9/2025                  Interval Top: 6899 ft.    Interval Bottom: 6909 ft.

 Completed Information for Formation CODELL
1st Production Date:3/10/2005Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/15/2005
Treatment Summary:2/15/05 B J SERVICES FRACED WITH 2575 BBL OF VISTAR 20# GEL SYSTEM USING 217460# OF 20/40 FRAC SAND AND 8000# OF RESIN COATED SUPER LC 20/40 MESH
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 30
BTU_GAS 1385
CALC_GOR 2166
CASING_PRESS 180
GRAVITY_OIL 44
MCF_GAS 65
TUBING_PRESS 150
Perforation Data:
Interval Top:6899 ft.# Of Holes:48
Interval Bottom:6909 ft.Hole Size:0.34 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 4/8/2025                  Interval Top: 6608 ft.    Interval Bottom: 6909 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/4/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6608 ft.# Of Holes:76
Interval Bottom:6909 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/9/2025                  Interval Top: 6608 ft.    Interval Bottom: 6738 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/4/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6608 ft.# Of Holes:28
Interval Bottom:6738 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/08/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
12/20/2024
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No