Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22377
Well Classification: OW Status: PA - 4/8/2025
Well Name/No:CECIL #21-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/8/2025
FacilityID:273559LocationID:332494
County:WELD #123Location:NENW 12 6N64W 6
Field:WATTENBERG - #90750Elevation:4720 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:851FNL  2170 FWLLat/Long: 40.505744 / -104.500004Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.505610 / -104.499970Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 4/8/2025             Measured TD: 7166 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 4/8/2025
Wellbore Permit
Permit #:20041747 Expiration Date:9/1/2005
Proposed Depth/Form:8080 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DK-J , Formation: DAKOTA-JSND , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2NW4
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 8080 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 3580 ft., Bottom: 6580 ft.

Wellbore Completed
Completion Date:2/15/2005
Spud Date:12/10/2004Spud Date Is:ACTUAL
Measured TD:7166 ft.Measured PB depth:7141 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMP.DEN.,COMP.NEU, DUAL IND,.GR,CBL,CCL,VDL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 497 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 497 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7141 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 5735 ft., Bottom: 7141 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5735 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 327, Top: 3034 ft., Bottom: 5735 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2970 ft.NN
PARKMAN3555 ft.NN
SUSSEX3960 ft.NN
SHANNON4325 ft.NN
NIOBRARA6600 ft.NN
FORT HAYS6862 ft.NN
CODELL6898 ft.NN
CARLILE6914 ft.NN
GREENHORN6946 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/9/2025                  Interval Top: 6899 ft.    Interval Bottom: 6909 ft.

 Completed Information for Formation CODELL
1st Production Date:3/10/2005Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/15/2005
Treatment Summary:2/15/05 B J SERVICES FRACED WITH 2575 BBL OF VISTAR 20# GEL SYSTEM USING 217460# OF 20/40 FRAC SAND AND 8000# OF RESIN COATED SUPER LC 20/40 MESH
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 30
BTU_GAS 1385
CALC_GOR 2166
CASING_PRESS 180
GRAVITY_OIL 44
MCF_GAS 65
TUBING_PRESS 150
Perforation Data:
Interval Top:6899 ft.# Of Holes:48
Interval Bottom:6909 ft.Hole Size:0.34 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 4/8/2025                  Interval Top: 6608 ft.    Interval Bottom: 6909 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/4/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6608 ft.# Of Holes:76
Interval Bottom:6909 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/9/2025                  Interval Top: 6608 ft.    Interval Bottom: 6738 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/4/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6608 ft.# Of Holes:28
Interval Bottom:6738 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/08/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
12/20/2024
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No