| 403896210 | Form 17 | 8/12/2024 | 8/21/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 880 | 880 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
| Click for Specifics | Full | 2/20/2024 | 2/26/2024 | Shut In | 0 | Down to Zero | -- | 0 | Down to Zero | 730 | 730 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 2/20/2023 | 3/15/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 291 | 199 | No | None | None | |
| Click for Specifics | Full | 8/11/2022 | 9/6/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 341 | 342 | No | None | None | |
| Click for Specifics | Full | 4/7/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 423 | 424 | No | None | None | |
| Click for Specifics | Light | 8/7/2020 | 12/3/2020 | | 0 | | -- | 0 | No Flow | 449 | 449 | No | No | No | |
| Click for Specifics | Light | 6/13/2019 | 11/27/2019 | | 0 | | | 0 | No Flow | 572 | 572 | No | No | No | |