|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 9/4/2024 Measured TD: 7623 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 9/4/2024 | | Wellbore Permit | | | Permit #: | 20030219 | Expiration Date: | 2/17/2004 | | Proposed Depth/Form: | 7650 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-1 , Unit Acreage: 80, Drill Unit: E/2SW | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7650 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 154, Top: 6800 ft., Bottom: 7650 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/30/2003 | | Spud Date: | 6/15/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 7623 ft. | Measured PB depth: | 7581 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL - CDL - GR - CAL , C B L | | Casing: | String Type: CONDUCTOR, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 591 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 415, Top: 0 ft., Bottom: 591 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 591 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 415, Top: 0 ft., Bottom: 591 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7595 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 130, Top: 6736 ft., Bottom: 7595 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4552 ft. | 4616 ft. | N | N | | SHANNON | 4936 ft. | 5000 ft. | N | N | | NIOBRARA | 7160 ft. | 7427 ft. | N | N | | CODELL | 7482 ft. | 7506 ft. | N | N |
Formation CODL Formation Classification: OW Status: CM - 7/19/2006 Interval Top: 7484 ft. Interval Bottom: 7502 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/3/2003 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/30/2003 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 32 | | BBLS_OIL | 17 | | CALC_GOR | 8000 | | CASING_PRESS | 240 | | MCF_GAS | 136 |
| | Perforation Data: | | Interval Top: | 7484 ft. | # Of Holes: | 72 | | Interval Bottom: | 7502 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/4/2024 Interval Top: 7286 ft. Interval Bottom: 7502 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/30/2003 | | Treatment Summary: | ADDED NIOBRARA. (1ST PROD DATE OF 7/30/03 IS CODELL. 1ST PROD DATE NBRR IS 7/3/06. PERF TOP: 7286-7306, PERF BOTTOM 7484-7502) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7485 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/19/2006 | Test Method: | FLOWING | | Hours Tested: | 2 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 7 | | BBLS_OIL | 9 | | CALC_GOR | 4111 | | CASING_PRESS | 750 | | MCF_GAS | 37 | | TUBING_PRESS | 450 |
| | Perforation Data: | | Interval Top: | 7286 ft. | # Of Holes: | 112 | | Interval Bottom: | 7502 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 7/19/2006 Interval Top: 7286 ft. Interval Bottom: 7306 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/3/2006 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/25/2006 | | Treatment Summary: | FRAC'D NIOBRARA W/ 241,057# 20/40 SAND USING 82,292 GAL 14# VISTAR - ADDED NIOBRARA |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7286 ft. | # Of Holes: | 40 | | Interval Bottom: | 7306 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/04/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|