| Click for Specifics | Light | 1/24/2025 | 2/3/2025 | | 0 | | -- | 0 | | 267 | 267 | No | No | No | |
| Click for Specifics | Full | 2/26/2024 | 3/19/2024 | Shut In | 0 | Down to Zero | -- | 0 | Down to Zero | 0 | 0 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/23/2023 | 4/10/2023 | | 10 | Down to Zero | -- | 0 | Down to Zero | 0 | 0 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 4/7/2022 | 5/9/2022 | | 8 | Down to Zero | -- | 0 | No Flow | 0 | 0 | No | No | No | |
| Click for Specifics | Full | 4/11/2021 | 11/1/2021 | | 7 | Down to Zero | -- | 0 | No Flow | 24 | 24 | No | None | None | |
| Click for Specifics | Light | 6/11/2019 | 11/27/2019 | | 0 | | | 0 | | 479 | 479 | No | No | No | |
| 402445239 | Form 17 | 6/11/2019 | 7/16/2020 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 479 | 479 | No | -- | -- | This form is being submitted to correct 2019 SRC data. 0 PSI |