|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: TA - 3/21/2025 Measured TD: 7511 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW TA - 3/21/2025 | | Wellbore Permit | | | Permit #: | 990833 | Expiration Date: | 11/2/2000 | | Proposed Depth/Form: | 7500 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-1 , Unit Acreage: 160, Drill Unit: NE4 | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7500 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 530, Top: 0 ft., Bottom: 7500 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/9/1999 | | Spud Date: | 11/27/1999 | Spud Date Is: | ACTUAL | | Measured TD: | 7511 ft. | Measured PB depth: | 7476 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL-CDL-GR-CAL, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 601 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 450, Top: 0 ft., Bottom: 601 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7512 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 650, Top: 4824 ft., Bottom: 7512 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7512 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 650, Top: 601 ft., Bottom: 7512 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHANNON | 4815 ft. | 4878 ft. | N | N | | NIOBRARA | 7045 ft. | 7325 ft. | N | N | | CODELL | 7382 ft. | 7405 ft. | N | N |
Formation CODL Formation Classification: GW Status: TA - 3/21/2025 Interval Top: 7382 ft. Interval Bottom: 7402 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 12/13/1999 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/9/1999 | | Treatment Summary: | REFRACED CODELL W/260,680# 20-40 SD, USING 132,846 GAL 26# AND 24# VISTAR GEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 22 | | CALC_BBLS_H2O | 28 | | CALC_BBLS_OIL | 59 | | CALC_GOR | 18136 | | CALC_MCF_GAS | 295 | | CASING_PRESS | 800 | | MCF_GAS | 399 | | TUBING_PRESS | 530 |
| | Perforation Data: | | Interval Top: | 7382 ft. | # Of Holes: | 120 | | Interval Bottom: | 7402 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 03/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 12/07/2022 |
| Defined Inactive (TA ) | Y | Defined Inactive 01/31/2020 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|