Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19843
Well Classification: GW Status: TA - 3/21/2025
Well Name/No:LUNDVALL #13-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date3/21/2025
FacilityID:256371LocationID:330901
Municipality/County:GREELEY / WELD #123Location:SENE 13 5N67W 6
Field:WATTENBERG - #90750Elevation:4876 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1352FNL  909 FELLat/Long: 40.402974 / -104.835534Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.402930 / -104.835606Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: TA - 3/21/2025             Measured TD: 7511 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        TA - 3/21/2025
Wellbore Permit
Permit #:990833 Expiration Date:11/2/2000
Proposed Depth/Form:7500 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1 , Unit Acreage: 160, Drill Unit: NE4
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7500 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 530, Top: 0 ft., Bottom: 7500 ft.

Wellbore Completed
Completion Date:12/9/1999
Spud Date:11/27/1999Spud Date Is:ACTUAL
Measured TD:7511 ft.Measured PB depth:7476 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL-CDL-GR-CAL, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 601 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 601 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7512 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 4824 ft., Bottom: 7512 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7512 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 601 ft., Bottom: 7512 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SHANNON4815 ft.4878 ft.NN
NIOBRARA7045 ft.7325 ft.NN
CODELL7382 ft.7405 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  TA - 3/21/2025                 Interval Top: 7382 ft.    Interval Bottom: 7402 ft.

 Completed Information for Formation CODELL
1st Production Date:12/13/1999Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/9/1999
Treatment Summary:REFRACED CODELL W/260,680# 20-40 SD, USING 132,846 GAL 26# AND 24# VISTAR GEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 22
CALC_BBLS_H2O 28
CALC_BBLS_OIL 59
CALC_GOR 18136
CALC_MCF_GAS 295
CASING_PRESS 800
MCF_GAS 399
TUBING_PRESS 530
Perforation Data:
Interval Top:7382 ft.# Of Holes:120
Interval Bottom:7402 ft.Hole Size:0.34 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
03/31/2029
Inactive ExceptionN 
Noticed InactiveYNoticed Date
12/07/2022
Defined Inactive (TA )YDefined Inactive
01/31/2020
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No