| 402153463 | Form 17 | 8/19/2019 | 8/23/2019 | PLUNGER LIFT | 1 | WHISPER | -- | 0 | DOWN TO 0 | 680 | 680 | No | -- | -- | Surface casing produced no fluids. 15 minute shut in results in whisper. Tubing shut in. |
| 402086083 | Form 17 | 6/19/2019 | 6/24/2019 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 685 | 685 | No | -- | -- | Surface casing produced no fluids. 15 minute shut in resulted in 0 psi. Tubing shut in. |
| 400896089 | Form 17 | 8/31/2015 | 9/4/2015 | | 1 | GAS | -- | 0 | DOWN TO 0 | 474 | 479 | No | -- | -- | POST REMEDIATION TEST. SC DID NOT PRODUCE ANY FLUID. 15 MIN BUILD UP, DEAD. INITIAL POST REMEDIATION BLOW DOWN ON 8-31-15 STARTED WITH A WHISPER AND BLEW DOWN TO ZERO PSI. NO SIGN ON LOCATION. |
| 400893175 | Form 17 | 8/17/2015 | 8/31/2015 | | 1 | GAS | -- | 0 | DOWN TO 0 | 456 | 458 | No | -- | -- | SC PRODUCED NO FLUIDS DURING TEST. SHUT IN SC FOR 15 MIN ENDED WITH ZERO PSI AND DEAD |
| 400354193 | Form 17 | 10/23/2012 | 12/5/2012 | PLUNGER LIFT | 85 | GAS | -- | 15 | CONTINUOUS | 331 | 332 | No | -- | -- | Surface casing made 20 gallons of condensate. |