Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-17492
Well Classification: GW Status: PA - 9/18/2019
Well Name/No:HSR-OSTERMILLER #10-8A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/18/2019
FacilityID:249689LocationID:332624
County:WELD #123Location:NWSE 8 3N66W 6
Field:WATTENBERG - #90750Elevation:4870 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1988FSL  1978 FELLat/Long: 40.237470 / -104.799050Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.237488 / -104.799006Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 9/18/2019             Measured TD: 7961 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 9/18/2019
Wellbore Permit
Permit #:20020468 Expiration Date:3/11/2003
Proposed Depth/Form:7970 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: N2SE

Wellbore Completed
Completion Date:N/A
Spud Date:10/27/1993Spud Date Is:ACTUAL
Measured TD:7961 ft.Measured PB depth:7930 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL/SFL/GR; CBL; DEN/CNL/GR
Log Types:SAAILC, SACNLD, CBL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 473 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 473 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7511 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6146 ft., Bottom: 7511 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4720 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 3618 ft., Bottom: 4720 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 3618 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 0 ft., Bottom: 3618 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7450 ft., Depth: 7961 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 21, Top: 7450 ft., Bottom: 7961 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7084 ft.NN
FORT HAYS7349 ft.NN
CODELL7369 ft.NN
J SAND7808 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 9/18/2019                 Interval Top: 7827 ft.    Interval Bottom: 7870 ft.

 Completed Information for Formation J SAND
1st Production Date:7/10/2002Choke Size: 
Formation Name:J SANDCommingled:
Production Method:PLUNGER 500
Open Hole Completion:
Formation Treatment
Treatment Date:5/20/2002
Treatment Summary:FRAC'D W/500,580# 20/40 MESH; 208,747 GALS GELLED FLUID.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7827 ft.# Of Holes:
Interval Bottom:7870 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 7/10/2002                 Interval Top: 7085 ft.    Interval Bottom: 7870 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:7/10/2002Choke Size:0.250 in.
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:PLUNGER
Open Hole Completion:
Formation Treatment
Treatment Date:5/20/2002
Treatment Summary:J SAND COMMINGLED WITH NB-CD
Tubing Size:2.375 in.Tubing Setting Depth:7820 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/10/2002Test Method:PLUNGER
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 6
CALC_BBLS_OIL 6
CALC_GOR 58333
CALC_MCF_GAS 350
CASING_PRESS 510
GRAVITY_OIL 60
MCF_GAS 350
TUBING_PRESS 375
Perforation Data:
Interval Top:7085 ft.# Of Holes:
Interval Bottom:7870 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 9/18/2019                 Interval Top: 7085 ft.    Interval Bottom: 7386 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/17/1993Choke Size:0.187 in.
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:PLUNGER 500
Open Hole Completion:
Formation Treatment
Treatment Date:5/20/2002
Treatment Summary:7371-7386' FRAC'D W/279,400# 20/40 MESH SAND + 68,618 GAL GELLED FLUID. 7085-7253' FRAC'D W/194,000# 20/40 MESH SAND + 63,675 GAL GELLED FLUID.
Tubing Size:2.375 in.Tubing Setting Depth:7359 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/28/1993Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 37
CALC_BBLS_H2O 0
CALC_BBLS_OIL 37
CALC_GOR 10432
CALC_MCF_GAS 386
CASING_PRESS 1400
GRAVITY_OIL 60
MCF_GAS 386
TUBING_PRESS 1200
Perforation Data:
Interval Top:7085 ft.# Of Holes:47
Interval Bottom:7386 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/18/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No